Grid connection · England, United Kingdom

Tilbury Farm grid connection

Tilbury Farm grid connection is a planned grid connection in England, United Kingdom, with 49.9 MW of capacity, held by Roadnight Taylor Ltd.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceTILBURY FARM grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationEngland (connects at Oxford)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
HolderRoadnight Taylor LtdSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toBotley - Solar Photovoltaic Array (matched by coordinates+technology+capacity, 0.21 km away)Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026
Attached toOxford Primary (via a primary substation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity49.9 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologySolarSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorSouthern Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date15 Dec 2020SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date31 Dec 2027 (target energisation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates51.7553, -1.3052SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

Latest events

Dated events about this grid connection and the records linked to it from official notices and registers, newest first. All recent changes.

  1. Permit refused: Botley - Solar Photovoltaic Array (planning authority Vale of White Horse, reference P24/V2489/FUL)
  2. Permit applied for: Botley - Solar Photovoltaic Array (planning authority Vale of White Horse, reference P24/V2489/FUL)

How it compares

Tilbury Farm grid connection is the 597th-largest of 2,533 grid connections in England and the 904th-largest of 3,903 in the United Kingdom by capacity; its 49.9 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England597th of 2,533319,370 MW<0.1%
United Kingdom904th of 3,903446,745 MW<0.1%
All grid connections in our data4,270th of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Nearby

Within 50 km of this grid connection: 318 power plants (117 operating, 3,424 MW), 158 substations and 21 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Botley - Solar Photovoltaic ArrayPower plant50 MWCancelled0.2 km
Oxford (Osney) BSPSubstation——2.1 km
Oxford PrimarySubstation——2.2 km
North Hinksey PrimarySubstation——2.2 km
University Shared Data CentreData center——3.7 km
Cassington AD (Waste AD)Power plant2.1 MWOperating5.2 km
Minnis FarmPower plant5 MWCancelled5.3 km
AWS Didcot Data CentreData center——16 km
R89Data center——20 km

Holder, grid operator and place

More from Roadnight Taylor Ltd

Other grid connections in England

All 3831 grid connections in England, United Kingdom

Data on this page