Grid connection · England, United Kingdom
Newington Solar Plant grid connection
Newington Solar Plant grid connection is a planned grid connection in England, United Kingdom, with 13.7 MW of capacity, held by Roadnight Taylor Ltd.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Name in the source | NEWINGTON SOLAR PLANT grid connection | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Location | England (connects at Berinsfield) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Status | Planned (accepted to connect) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Holder | Roadnight Taylor Ltd | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Attached to | Berinsfield Primary (via a primary substation) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Capacity | 13.7 MW | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Technology | Solar | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Grid operator | Southern Electric Power Distribution plc | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Queue date | 23 Mar 2021 | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Connection date | 23 Jun 2028 (target energisation) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Voltage | 33 kV | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Coordinates | 51.6587, -1.1284 | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.
Request researchHow it compares
Newington Solar Plant grid connection is the 1,239th-largest of 2,533 grid connections in England and the 1,968th-largest of 3,903 in the United Kingdom by capacity; its 13.7 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 1,239th of 2,533 | 319,370 MW | <0.1% |
| United Kingdom | 1,968th of 3,903 | 446,745 MW | <0.1% |
| All grid connections in our data | 5,795th of 7,928 | 1,372,494 MW | <0.1% |
Timeline
Dated facts about this grid connection from its sources, oldest first.
- Entered the connection queue
- Due to connect
Nearby
Within 50 km of this grid connection: 352 power plants (117 operating, 1,694 MW), 221 substations and 74 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Berinsfield Primary | Substation | — | — | 2.0 km |
| Wally Corner Landfill Site | Power plant | 7 MW | Operating | 2.1 km |
| Langley Hall Farm | Power plant | 2.4 MW | Operating | 2.4 km |
| Burcot Farm Battery Storage | Power plant | 49.9 MW | Cancelled | 3.4 km |
| Wallingford Primary | Substation | — | — | 6.4 km |
| Cowley GSP | Substation | — | — | 7.2 km |
| AWS Didcot Data Centre | Data center | — | — | 10 km |
| University Shared Data Centre | Data center | — | — | 14 km |
| R89 | Data center | — | — | 16 km |
Holder, grid operator and place
More from Roadnight Taylor Ltd
- 99.9MW BESS grid connection111 MW
- Roosecote LDES Power Station grid connection50 MW
- Tilbury Farm grid connection49.9 MW
- Perwinnes grid connection48 MW
- Ducklington Solar grid connection18 MW
- Welsh Way - Solar PV grid connection11 MW
- Parkhill South Solar Farm grid connection8.8 MW
- Lains Farm grid connection6.6 MW
Other grid connections in England
- Bute Hydrogen Project 1 grid connection4,800 MW
- Drax BECCS grid connection3,906 MW
- Drax Power Station grid connection3,906 MW
- Bute Hydrogen Project 2 grid connection3,600 MW
- Bute Hydrogen Project 3 grid connection3,600 MW
- Bute Hydrogen Project 5 grid connection3,600 MW
- Bute Hydrogen Project 6 grid connection3,600 MW
- Hinkley Point C grid connection3,340 MW
Data on this page
- California ISO. CAISO queue report, CAISO Privacy and Terms of Use.
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- NYISO interconnection queue. NYISO interconnection queue, Free reuse.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- PJM New Services Queue. PJM New Services Queue, Free reuse.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.