Grid connection · England, United Kingdom
Ducklington Solar grid connection
Ducklington Solar grid connection is a planned grid connection in England, United Kingdom, with 18 MW of capacity, held by Roadnight Taylor Ltd.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Name in the source | DUCKLINGTON SOLAR grid connection | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Location | England (connects at Witney) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Status | Planned (accepted to connect) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Holder | Roadnight Taylor Ltd | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Attached to | Witney BSP (via a bulk supply point) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Attached to | Ducklington Solar Farm (matched by name+coordinates+technology, 0.54 km away) | Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026 |
| Capacity | 18 MW | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Technology | Solar | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Grid operator | Southern Electric Power Distribution plc | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Queue date | 24 Jul 2024 | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Connection date | 30 Sept 2026 (target energisation) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Voltage | 33 kV | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Coordinates | 51.7645, -1.5092 | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.
Request researchHow it compares
Ducklington Solar grid connection is the 1,129th-largest of 2,533 grid connections in England and the 1,791st-largest of 3,903 in the United Kingdom by capacity; its 18 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 1,129th of 2,533 | 319,370 MW | <0.1% |
| United Kingdom | 1,791st of 3,903 | 446,745 MW | <0.1% |
| All grid connections in our data | 5,568th of 7,928 | 1,372,494 MW | <0.1% |
Timeline
Dated facts about this grid connection from its sources, oldest first.
- Entered the connection queue
- Was due to connect; the register does not list it as connected
Nearby
Within 50 km of this grid connection: 306 power plants (120 operating, 1,962 MW), 124 substations and 10 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Ducklington Solar Farm | Power plant | 36 MW | Under construction | 0.5 km |
| Witney BSP | Substation | — | — | 1.9 km |
| Witney Bypass, Stanton Harcourt Road - Battery Storage | Power plant | 150 MW | Planned | 2.0 km |
| Caswell Lane, Brize Norton - Solar Farm & Battery Storage | Power plant | 30 MW | Planned | 2.3 km |
| Windrush Park Primary | Substation | — | — | 2.4 km |
| Witney Town Primary | Substation | — | — | 2.9 km |
| University Shared Data Centre | Data center | — | — | 18 km |
| nLighten Swindon | Data center | — | — | 24 km |
| AWS Didcot Data Centre | Data center | — | — | 24 km |
Holder, grid operator and place
More from Roadnight Taylor Ltd
- 99.9MW BESS grid connection111 MW
- Roosecote LDES Power Station grid connection50 MW
- Tilbury Farm grid connection49.9 MW
- Perwinnes grid connection48 MW
- Newington Solar Plant grid connection13.7 MW
- Welsh Way - Solar PV grid connection11 MW
- Parkhill South Solar Farm grid connection8.8 MW
- Lains Farm grid connection6.6 MW
Other grid connections in England
- Bute Hydrogen Project 1 grid connection4,800 MW
- Drax BECCS grid connection3,906 MW
- Drax Power Station grid connection3,906 MW
- Bute Hydrogen Project 2 grid connection3,600 MW
- Bute Hydrogen Project 3 grid connection3,600 MW
- Bute Hydrogen Project 5 grid connection3,600 MW
- Bute Hydrogen Project 6 grid connection3,600 MW
- Hinkley Point C grid connection3,340 MW
Data on this page
- California ISO. The terms cover every document on caiso.com, the cluster reports included. CAISO queue report, CAISO Privacy and Terms of Use.
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- NYISO interconnection queue. NYISO interconnection queue, Free reuse.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- PJM New Services Queue. PJM New Services Queue, Free reuse.
- Rare Context entity resolution. Rare Context entity resolution, CC0 1.0.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.