Peattie Farm PV grid connection

Peattie Farm PV grid connection is a planned grid connection in Scotland, United Kingdom, with 49.7 MW of capacity, connected by Scottish Hydro Electric.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourcePEATTIE FARM PV grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationScotland (connects at Fiddes)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toFiddes GSP (via a primary substation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity49.7 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologySolarSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorScottish Hydro ElectricSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date11 Aug 2025SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date31 Oct 2033 (target energisation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates56.8493, -2.3179SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

How it compares

Peattie Farm PV grid connection is the 292nd-largest of 1,192 grid connections in Scotland and the 1,003rd-largest of 3,903 in the United Kingdom by capacity; its 49.7 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Scotland292nd of 1,19288,894 MW<0.1%
United Kingdom1,003rd of 3,903446,745 MW<0.1%
All grid connections in our data4,377th of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Nearby

Within 50 km of this grid connection: 152 power plants (33 operating, 1,565 MW), 73 substations and 1 data center, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.

NameKindSizeStatusDistance
GreenleysPower plant1.7 MWCancelled2.1 km
Inverbervie PrimarySubstation——2.1 km
Brownieleys - 3 Wind TurbinesPower plant7.5 MWOperating3.6 km
Easter Tulloch Wind Farm (Tullo Extension)Power plant25 MWOperating4.7 km
Fiddes GSPSubstation——8.4 km
St Cyrus PrimarySubstation——9.5 km
BrightsolidData center——35 km

Grid operator and place

More from Scottish Hydro Electric

Other grid connections in Scotland

All 1192 grid connections in Scotland, United Kingdom

Data on this page