Power plant · Aberdeenshire, Scotland, United Kingdom

Brownieleys - 3 Wind Turbines

Brownieleys - 3 Wind Turbines is a power plant in Aberdeenshire, Scotland, United Kingdom, with 7.5 MW of capacity, operated by Brownieleys Renewables and Muirden Energy.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceBROWNIELEYS - 3 WIND TURBINESDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
LocationAberdeenshire (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressNw/O Brownieleys, Fordoun, Alford, Grampian, AB33 1JNDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2017DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Onshore or offshoreOnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date1 Oct 2013 (permit APP/2012/1121, Town and Country Planning Act, issued by Aberdeenshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date13 Apr 2012 (reference APP/2012/1121, planning authority Aberdeenshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date1 Apr 2013 (refused, reference APP/2012/1121, planning authority Aberdeenshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date1 Oct 2013 (granted, reference APP/2012/1121, planning authority Aberdeenshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date1 Oct 2013 (appeal granted, reference APP/2012/1121, planning authority Aberdeenshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorBrownieleys Renewables (Brownieleys Renewables/Muirden Energy)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorMuirden Energy (Brownieleys Renewables/Muirden Energy)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity7.5 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Units3 units (2.35 MW per unit)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyWind OnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates56.8415, -2.3760DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Commissioned
  2. Permit granted (appeal granted, planning authority Aberdeenshire, reference APP/2012/1121)
  3. Permit granted (planning authority Aberdeenshire, reference APP/2012/1121)
  4. Permit refused (planning authority Aberdeenshire, reference APP/2012/1121)
  5. Permit applied for (planning authority Aberdeenshire, reference APP/2012/1121)

How it compares

Brownieleys - 3 Wind Turbines is the 677th-largest of 1,196 power plants in Scotland and the 2,284th-largest of 5,050 in the United Kingdom by capacity; its 7.5 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
Scotland677th of 1,19634,589 MW<0.1%
United Kingdom2,284th of 5,050115,622 MW<0.1%
All power plants in our data7,756th of 12,0321,190,447 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Started operating

Nearby

Within 50 km of this power plant: 98 grid connections (28 operating, 301 MW), 74 substations and 1 data center, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.

NameKindSizeStatusDistance
Brownieleys Wind grid connectionGrid connection7.5 MWOperating0.7 km
Brotherton Wind Generating Station grid connectionGrid connection4.6 MWOperating3.4 km
Peattie Farm PV grid connectionGrid connection49.7 MWPlanned3.6 km
Inverbervie PrimarySubstation——5.7 km
Laurencekirk PrimarySubstation——6.4 km
St Cyrus PrimarySubstation——7.1 km
BrightsolidData center——37 km

Operators and place

Grid connections attached to this power plant

Other power plants in Scotland

All 2093 power plants in Scotland, United Kingdom