Grid connection · Scotland, United Kingdom

Peattie Farm grid connection

Peattie Farm grid connection is a planned grid connection in Scotland, United Kingdom, with 22 MW of capacity, connected by Scottish Hydro Electric.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourcePEATTIE FARM grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationScotland (connects at Coupar Angus)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toCoupar Angus GSP (via a grid supply point)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toMill Of Peattie Farm, Kinnochtry Coupar - Solar Farm (matched by shared name+coordinates+technology+capacity, 0.25 km away)Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026
Capacity22 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologySolarSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorScottish Hydro ElectricSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date16 Feb 2023SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date30 Oct 2029 (target energisation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates56.5124, -3.2626SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

Latest events

Dated events about this grid connection and the records linked to it from official notices and registers, newest first. All recent changes.

  1. Permit refused: Mill Of Peattie Farm, Kinnochtry Coupar - Solar Farm (planning authority Perth and Kinross, reference 25/00104/FLM)
  2. Permit applied for: Mill Of Peattie Farm, Kinnochtry Coupar - Solar Farm (planning authority Perth and Kinross, reference 25/00104/FLM)

How it compares

Peattie Farm grid connection is the 534th-largest of 1,192 grid connections in Scotland and the 1,574th-largest of 3,903 in the United Kingdom by capacity; its 22 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Scotland534th of 1,19288,894 MW<0.1%
United Kingdom1,574th of 3,903446,745 MW<0.1%
All grid connections in our data5,163rd of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Nearby

Within 50 km of this grid connection: 272 power plants (64 operating, 1,002 MW) and 70 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Mill Of Peattie Farm, Kinnochtry Coupar - Solar FarmPower plant22 MWCancelled0.2 km
Mill Of Peattie Farm, Kinnochtry Coupar - Battery StoragePower plant18 MWCancelled0.6 km
Coupar Angus Substation, Pleasance Road - Solar FarmPower plant49.9 MWCancelled2.7 km
Coupar Angus PrimarySubstation——3.0 km
Coupar Angus GSPSubstation——3.0 km
Balbeggie PrimarySubstation——8.3 km

Grid operator and place

More from Scottish Hydro Electric

Other grid connections in Scotland

All 1192 grid connections in Scotland, United Kingdom