Grid connection · Scotland, United Kingdom

Landfill gas 1.9 MW grid connection at Lunanhead

Landfill gas 1.9 MW grid connection at Lunanhead is a grid connection in Scotland, United Kingdom, with 1.9 MW of capacity, held by Viridis Energy (Norgen) Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceLandfill gas 1.9 MW grid connection at LUNANHEADSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationScotland (connects at Lunanhead)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusOperating (connected)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
HolderViridis Energy (Norgen) LimitedSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toLochhead Landfill Scheme (matched by coordinates+technology+capacity, 0.39 km away)Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026
Attached toLunanhead Primary (via a primary substation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity1.9 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyLandfill gasSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorScottish Hydro Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage11 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates56.6469, -2.8435SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its holder? Ask us.

How it compares

Landfill gas 1.9 MW grid connection at Lunanhead is the 1,061st-largest of 1,192 grid connections in Scotland and the 3,427th-largest of 3,903 in the United Kingdom by capacity; its 1.9 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Scotland1,061st of 1,19288,894 MW<0.1%
United Kingdom3,427th of 3,903446,745 MW<0.1%
All grid connections in our data7,123rd of 7,6161,281,251 MW<0.1%

Nearby

Within 50 km of this grid connection: 197 power plants (42 operating, 556 MW) and 72 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Lochhead Farmouse, Lochhead - Solar Photovoltaic ArrayPower plant1 MWPermitted0.3 km
Lochhead Landfill SchemePower plant2 MWOperating0.4 km
Lunanhead PrimarySubstation——1.6 km
Lunanhead GSPSubstation——1.6 km
Whitehills Energy Storage FacilityPower plant49.9 MWUnder construction1.7 km
Lochside PrimarySubstation——3.2 km

Holder, grid operator and place

More from Viridis Energy (Norgen) Limited

Other grid connections in Scotland

All 1192 grid connections in Scotland, United Kingdom

Data on this page