Substation · Scotland, United Kingdom

Lochside Primary

Lochside Primary is a 33 kV primary substation in Scotland, United Kingdom, with 7.52 MVA of demand headroom and 0 MW of generation headroom, connected by Scottish Hydro Electric Power Distribution plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationScotlandSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorScottish Hydro Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Demand headroom7.52 MVASSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Generation headroom0 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Transformers2 x 12 / 24MVASSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LevelPrimary substationSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Fed fromLunanhead GSPSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Congestion (offtake)None (green on the heat map)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Congestion (feed-in)Full (red on the heat map, limited by upstream thermal capacity)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kV (levels 33, 11 kV)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates56.6435, -2.8960SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this substation and its grid operator.Who owns it up to the parent company, its headroom, congestion and the land around it, and an introduction to the grid operator.

Request research

Nearby

Within 50 km of this substation: 205 power plants (43 operating, 565 MW) and 108 grid connections (33 operating, 500 MW), measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Newfordpark House, Glamis Road - Solar PanelsPower plant6.68 MWPermitted0.7 km
Orchardbank Industrial EstatePower plant10 MWCancelled0.9 km
Don and Low Ltd grid connectionGrid connection3.4 MWPlanned0.9 km
Newfordpark House grid connectionGrid connection2.4 MWPlanned0.9 km
Battery storage 9.999 MW grid connection at Lunanhead GridGrid connection10 MWOperating1.2 km
Carseview Road - Battery Energy Storage SystemPower plant49.9 MWPermitted1.5 km

Grid operator and place

Grid connections attached to this substation

More from Scottish Hydro Electric Power Distribution plc

Other substations in Scotland

All 453 substations in Scotland, United Kingdom

Data on this page