Power plant · Angus, Scotland, United Kingdom

Lochhead Farmouse, Lochhead - Solar Photovoltaic Array

Lochhead Farmouse, Lochhead - Solar Photovoltaic Array is a permitted power plant in Angus, Scotland, United Kingdom, with 1 MW of capacity, operated by Laird Aggregates Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationAngus (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Address150m N/O Lochhead Farmouse, Lochhead, Forfar, DD8 2RLDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date2 Sept 2025 (permit 25/00331/FULL, Town and Country Planning Act, issued by Angus)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date17 Jun 2025 (reference 25/00331/FULL, planning authority Angus)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date2 Sept 2025 (granted, reference 25/00331/FULL, planning authority Angus)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorLaird Aggregates Limited (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity1 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area0.2 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates56.6485, -2.8405DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Angus, reference 25/00331/FULL)
  2. Permit applied for (planning authority Angus, reference 25/00331/FULL)

How it compares

Lochhead Farmouse, Lochhead - Solar Photovoltaic Array is the 730th-largest of 742 power plants planned, permitted or under construction in Scotland and the 2,458th-largest of 2,549 in the United Kingdom by capacity; its 1 MW is <0.1% of the 279,978 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
Scotland730th of 74293,216 MW<0.1%
United Kingdom2,458th of 2,549279,978 MW<0.1%
All power plants planned, permitted or under construction in our data5,691st of 5,782643,557 MW<0.1%

Nearby

Within 50 km of this power plant: 108 grid connections (33 operating, 497 MW) and 72 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Landfill gas 1.9 MW grid connection at LunanheadGrid connection1.9 MWOperating0.3 km
Land OFF the B9134 - Electrical Energy grid connectionGrid connection50 MWPlanned1.4 km
Land OFF the B9134 - BESS grid connectionGrid connection50 MWPlanned1.4 km
Lunanhead PrimarySubstation——1.7 km
Lunanhead GSPSubstation——1.7 km
Lochside PrimarySubstation——3.4 km

Operator and place

Other power plants in Scotland

All 2093 power plants in Scotland, United Kingdom