Grid connection · Scotland, United Kingdom
Greengairs Landfill 3 & 4 grid connection
Greengairs Landfill 3 & 4 grid connection is a grid connection in Scotland, United Kingdom, with 2 MW of capacity, held by Infinis Energy Services Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Scotland (connects at Cumbernauld) | SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Status | Operating (connected) | SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Holder | Infinis Energy Services Limited | SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Capacity | 2 MW | SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Technology | Landfill gas | SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Grid operator | SP Distribution plc | SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Voltage | 33 kV | SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026 |
Know more about this grid connection, or want an introduction to its holder? Ask us.
How it compares
Greengairs Landfill 3 & 4 grid connection is the 1,031st-largest of 1,192 grid connections in Scotland and the 3,341st-largest of 3,903 in the United Kingdom by capacity; its 2 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| Scotland | 1,031st of 1,192 | 88,894 MW | <0.1% |
| United Kingdom | 3,341st of 3,903 | 446,745 MW | <0.1% |
| All grid connections in our data | 7,035th of 7,616 | 1,281,251 MW | <0.1% |
Holder, grid operator and place
More from Infinis Energy Services Limited
- Rigby PV+BESS grid connection4.26 MW
- Rigby Houghton Landfill grid connection4 MW
- Bennett Bank Landfill Site grid connection3.1 MW
- Distington Landfill Site grid connection2.6 MW
- Distington Landfill Site grid connection2.32 MW
- Danes Moss Landfill Site 2 grid connection2.1 MW
- Greengairs Landfill 1 grid connection2 MW
- Greengairs Landfill 2 grid connection2 MW
Other grid connections in Scotland
- Marram Wind Offshore Wind Farm grid connection3,000 MW
- OWPL Windfarm grid connection2,250 MW
- Caledonia Offshore Wind Farm grid connection2,000 MW
- Machair Offshore Wind Farm grid connection2,000 MW
- Arven Offshore Wind Farm grid connection1,800 MW
- Bellrock Offshore Wind Farm grid connection1,800 MW
- Earba PSH grid connection1,800 MW
- Glen Earrach PSH grid connection1,800 MW
Data on this page
- California ISO. Checked 2026-10-24. CAISO queue report, CAISO Privacy and Terms of Use.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- NYISO interconnection queue. NYISO interconnection queue, Free reuse.
- PJM New Services Queue. PJM New Services Queue, Free reuse.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.