Grid connection · Scotland, United Kingdom

Greengairs Landfill 3 & 4 grid connection

Greengairs Landfill 3 & 4 grid connection is a grid connection in Scotland, United Kingdom, with 2 MW of capacity, held by Infinis Energy Services Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationScotland (connects at Cumbernauld)SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
StatusOperating (connected)SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
HolderInfinis Energy Services LimitedSP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity2 MWSP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyLandfill gasSP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorSP Distribution plcSP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its holder? Ask us.

How it compares

Greengairs Landfill 3 & 4 grid connection is the 1,031st-largest of 1,192 grid connections in Scotland and the 3,341st-largest of 3,903 in the United Kingdom by capacity; its 2 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Scotland1,031st of 1,19288,894 MW<0.1%
United Kingdom3,341st of 3,903446,745 MW<0.1%
All grid connections in our data7,035th of 7,6161,281,251 MW<0.1%

Holder, grid operator and place

More from Infinis Energy Services Limited

Other grid connections in Scotland

All 1192 grid connections in Scotland, United Kingdom

Data on this page