Distington Landfill Site grid connection is a grid connection in England, United Kingdom, with 2.32 MW of capacity, held by Infinis Energy Services Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceDISTINGTON LANDFILL SITE grid connectionSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
LocationEngland (connects at HDA NO1 & HDA NO2)SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
StatusOperating (connected)SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
HolderInfinis Energy Services LimitedSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toStainburn & Siddick BSP (via a bulk supply point)SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity2.32 MWSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyLandfill gasSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorElectricity North West LimitedSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date1 Mar 2000SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage11 kVSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates54.6097, -3.5077SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

How it compares

Distington Landfill Site grid connection is the 2,114th-largest of 2,533 grid connections in England and the 3,242nd-largest of 3,903 in the United Kingdom by capacity; its 2.32 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England2,114th of 2,533319,370 MW<0.1%
United Kingdom3,242nd of 3,903446,745 MW<0.1%
All grid connections in our data7,246th of 7,9281,372,494 MW<0.1%

Nearby

Within 50 km of this grid connection: 105 power plants (39 operating, 414 MW) and 37 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Shearman FieldPower plant1.9 MWOperating0.2 km
Lillyhall Wind FarmPower plant9.2 MWCancelled0.2 km
Distington LandfillPower plant1.8 MWOperating0.5 km
HDA NO1Substation——0.8 km
Leyland NationalSubstation——1.3 km
HDA NO2Substation——1.3 km