RARE CONTEXT Request research

Grid connection · England, United Kingdom

Mill Lane grid connection

Mill Lane grid connection is a grid connection in England, United Kingdom, with 2.98 MW of capacity, held by Infinis Energy Services Limited.

Map: where Mill Lane grid connection lies
51.6962, 0.2600 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Ongar Primary 11kV)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusOperating (connected)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderInfinis Energy Services LimitedUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Attached toOngar Primary 11kV (via a primary substation)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Capacity2.98 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologyGasUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Connection date13 Jul 2018UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage11 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates51.6962, 0.2600UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

How it compares

Mill Lane grid connection is the 2,808th-largest of 3,539 grid connections in England and the 3,853rd-largest of 4,870 in the United Kingdom by capacity; its 2.98 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England2,808th of 3,539341,715 MW<0.1%
United Kingdom3,853rd of 4,870467,981 MW<0.1%
All grid connections in our data7,581st of 8,6181,355,288 MW<0.1%

Nearby

Within 50 km of this grid connection: 498 substations, 401 power plants (155 operating, 7,900 MW), 76 data centers (1 operating, 88 MW), 1 AI supercomputer and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Ongar Landfill Ground mounted solar photovoltaicPower plant8.8 MWCancelled0.2 km
Ongar Landfill Scheme 2Power plant1.8 MWOperating0.3 km
Ongar Landfill SchemePower plant1 MWOperating0.3 km
Ongar Primary 11kVSubstation——0.3 km
High St Primary 11kVSubstation——8.9 km
Hutton Primary 11kVSubstation——9.1 km
NVIDIA Cambridge-1AI supercomputer202 H100eOperating12 km
Kao Data KLON-01Data center——12 km
Kao Data KLON-02Data center——12 km

Holder, grid operator and place

More from Infinis Energy Services Limited

Other grid connections in England

All 4837 grid connections in England, United Kingdom

Data on this page