Grid connection · Scotland, United Kingdom

Cornabo - Wind grid connection

Cornabo - Wind grid connection is a planned grid connection in Scotland, United Kingdom, with 2.4 MW of capacity, connected by Scottish Hydro Electric.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceCORNABO - WIND grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationScotland (connects at Whitehouse)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toCornabo (matched by name+coordinates+technology+capacity, 1.13 km away)Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026
Attached toWhitehouse Primary (via a primary substation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity2.4 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyWindSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorScottish Hydro ElectricSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date15 Aug 2019SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date30 Nov 2028 (target energisation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage11 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates57.2546, -2.5697SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

Latest events

Dated events about this grid connection and the records linked to it from official notices and registers, newest first. All recent changes.

  1. Permit expired: Cornabo
  2. Permit granted: Cornabo (planning authority Aberdeenshire, reference APP/2014/1338)
  3. Permit granted: Cornabo (appeal granted, planning authority Aberdeenshire, reference APP/2014/1338)
  4. Permit refused: Cornabo (planning authority Aberdeenshire, reference APP/2014/1338)
  5. Permit applied for: Cornabo (planning authority Aberdeenshire, reference APP/2014/1338)

How it compares

Cornabo - Wind grid connection is the 972nd-largest of 1,192 grid connections in Scotland and the 3,207th-largest of 3,903 in the United Kingdom by capacity; its 2.4 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Scotland972nd of 1,19288,894 MW<0.1%
United Kingdom3,207th of 3,903446,745 MW<0.1%
All grid connections in our data7,211th of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Nearby

Within 50 km of this grid connection: 243 power plants (77 operating, 865 MW), 85 substations and 1 data center, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.

NameKindSizeStatusDistance
CornaboPower plant2.7 MWCancelled1.1 km
Cornabo, Monymusk - Wind turbinesPower plant3.9 MWPermitted1.6 km
Whitehouse PrimarySubstation——5.2 km
Kemnay PrimarySubstation——7.6 km
PressendyePower plant16.1 MWCancelled8.1 km
Inverurie PrimarySubstation——10 km
BrightsolidData center——27 km

Grid operator and place

More from Scottish Hydro Electric

Other grid connections in Scotland

All 1192 grid connections in Scotland, United Kingdom

Data on this page