Substation · Scotland, United Kingdom
Arbroath GSP
Arbroath GSP is a substation in Scotland, United Kingdom, connected by Scottish Hydro Electric Power Distribution plc.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Scotland | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Grid operator | Scottish Hydro Electric Power Distribution plc | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Congestion (offtake) | Full (rag: Red, constraint: Substation Thermal Capacity) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Congestion (feed-in) | Full (rag: Red, constraint: Substation Thermal Capacity) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Transformers | 2 x 45MVA | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Level | Gsp | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Voltage | 132/33 kV | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Coordinates | 56.5638, -2.6195 | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
Know more about this substation, or want an introduction to its grid operator? Ask us.
Nearby
Within 50 km of this substation: 96 grid connections (28 operating, 428 MW), measured from the coordinates in the facts above. The table shows the nearest 3.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Crudie Acres Farm grid connection | Grid connection | 49.9 MW | Planned | 0.4 km |
| Lochaber Farm grid connection | Grid connection | 50 MW | Planned | 1.6 km |
| Lochaber Farm 50MW PV/BESS grid connection | Grid connection | 50 MW | Planned | 1.6 km |
Grid operator and place
Upstream substation
Grid connections attached to this substation
- Blindwells Farm grid connection52.7 MW
- Craigend PV Farm grid connection72.4 MW
- Crudie Acres Farm grid connection49.9 MW
- East Balmirmer Farm grid connection57.5 MW
- Lochaber Farm 50MW PV/BESS grid connection50 MW
- Lochaber Farm grid connection50 MW
- New Mains of Guynd PV grid connection9.03 MW
- New Mains of Kinblethmont PV grid connection4.75 MW
- Parkhill Farm PV grid connection4.75 MW
- New Mains of Guynd PV grid connection4.51 MW
- Parkhill South Solar Farm grid connection8.8 MW
More from Scottish Hydro Electric Power Distribution plc
- Abernethy GSPsubstation
- Abernethy Primarysubstation
- Balbeggie Primarysubstation
- Bridge of Earn Primarysubstation
- Errol Primarysubstation
- Glendevon Primarysubstation
- Milnathort Primarysubstation
- Harbour Primarysubstation
Other substations in Scotland
Data on this page
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.