RARE CONTEXT Request research

Grid connection · England, United Kingdom

Viridor Waste Management, Beddington Farm Landfill Site grid connection

Viridor Waste Management, Beddington Farm Landfill Site grid connection is a grid connection in England, United Kingdom, with 7 MW of capacity, held by Valencia Waste Management Limited.

Map: where Viridor Waste Management, Beddington Farm Landfill Site grid connection lies
51.3819, -0.1296 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Beddington 11kV)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusOperating (connected)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderValencia Waste Management LimitedUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Capacity7 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologyLandfill gasUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorSouth Eastern Power Networks plc (UK Power Networks, South East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Connection date11 Jan 2006UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage11 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates51.3819, -0.1296UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

How it compares

Viridor Waste Management, Beddington Farm Landfill Site grid connection is the 2,072nd-largest of 3,539 grid connections in England and the 2,906th-largest of 4,870 in the United Kingdom by capacity; its 7 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England2,072nd of 3,539341,715 MW<0.1%
United Kingdom2,906th of 4,870467,981 MW<0.1%
All grid connections in our data6,579th of 8,6181,355,288 MW<0.1%

Nearby

Within 50 km of this grid connection: 590 substations, 352 power plants (130 operating, 4,311 MW), 152 data centers (1 operating, 88 MW), 1 transmission line and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Beddington AD Facility (Waste AD)Power plant2 MWCancelled0.3 km
Segro Croydon (Morgan Stanley)Data center——0.5 km
CapitalLand - CroydenData center——0.6 km
Beddington 11kVSubstation——1.0 km
Beddington EfWPower plant26 MWOperating1.0 km
Beddington 33kVSubstation——1.1 km
CroydonPower plant50 MWOperating1.3 km
Croydon B 33kVSubstation——1.3 km
Pulsant South LondonData center——3.2 km

Holder, grid operator and place

More from Valencia Waste Management Limited

Other grid connections in England

All 4837 grid connections in England, United Kingdom

Data on this page