Grid connection · England, United Kingdom

Moss Hall Lane Generator grid connection

Moss Hall Lane Generator grid connection is a grid connection in England, United Kingdom, with 4.5 MW of capacity, held by Viridor Waste Management Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceMOSS HALL LANE GENERATOR grid connectionSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
LocationEngland (connects at Heap Bridge)SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
StatusOperating (connected)SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
HolderViridor Waste Management LimitedSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toPilsworth Landfill Site (matched by coordinates+technology+capacity+company, 1.17 km away)Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026
Attached toHeap Bridge (via a primary substation)SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity4.5 MWSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyBattery storageSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorElectricity North West LimitedSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date1 Feb 2018SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage6.6 kVSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates53.5860, -2.2557SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

Latest events

Dated events about this grid connection and the records linked to it from official notices and registers, newest first. All recent changes.

  1. Commissioned: Pilsworth Landfill Site

How it compares

Moss Hall Lane Generator grid connection is the 1,765th-largest of 2,533 grid connections in England and the 2,736th-largest of 3,903 in the United Kingdom by capacity; its 4.5 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England1,765th of 2,533319,370 MW<0.1%
United Kingdom2,736th of 3,903446,745 MW<0.1%
All grid connections in our data6,715th of 7,9281,372,494 MW<0.1%

Nearby

Within 50 km of this grid connection: 468 substations, 378 power plants (109 operating, 1,024 MW), 19 data centers, 2 gas storage facilities and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Pilsworth Quarry Landfill SchemePower plant4.1 MWOperating0.2 km
Heap BridgeSubstation——0.6 km
Pilsworth Landfill SitePower plant5 MWOperating1.2 km
Heady HillSubstation——1.6 km
Bury Town CentreSubstation——2.3 km
Lascar WorksPower plant20 MWOperating2.8 km
Evolution @ Agecroft Commerce ParkData center——9.3 km
Asanti ManchesterData center——12 km
Joule HouseData center——13 km

Holder, grid operator and place

More from Viridor Waste Management Limited

Other grid connections in England

All 3831 grid connections in England, United Kingdom