Beddington AD Facility (Waste AD) is a cancelled power plant in Sutton, England, United Kingdom, with 2 MW of capacity, operated by Viridor.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationSutton (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressBeddington Lane, Beddington, CR0 4THDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning application withdrawn)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date2 Mar 2010 (reference D2010/62424, planning authority Sutton)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date7 Jul 2017 (withdrawn, reference D2010/62424, planning authority Sutton)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorViridorDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity2 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyAnaerobic DigestionDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.3791, -0.1302DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Withdrawn (planning authority Sutton, reference D2010/62424)
  2. Permit applied for (planning authority Sutton, reference D2010/62424)

How it compares

Beddington AD Facility (Waste AD) is the 2,789th-largest of 3,430 power plants in England and the 4,162nd-largest of 5,050 in the United Kingdom by capacity; its 2 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England2,789th of 3,43071,965 MW<0.1%
United Kingdom4,162nd of 5,050115,622 MW<0.1%
All power plants in our data10,440th of 12,0321,190,447 MW<0.1%

Nearby

Within 50 km of this power plant: 152 data centers (1 operating, 88 MW), 119 substations, 47 grid connections (30 operating, 313 MW), 1 transmission line and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Segro Croydon (Morgan Stanley)Data center——0.7 km
CapitalLand - CroydenData center——0.8 km
Pulsant South LondonData center——2.9 km
Ariel Way White City London grid connectionGrid connection2.2 MWOperating16 km
Harvard lane PrimarySubstation——16 km
Tertiary Study grid connectionGrid connection57 MWPlanned16 km
Southfield Road PrimarySubstation——17 km
Goldsmiths PrimarySubstation——17 km
Solar 6.935 MW grid connection at Maiden NewtonGrid connection6.94 MWOperating19 km