RARE CONTEXT Request research

Grid connection · England, United Kingdom

Fourth Drove Eastern Industrial Estate grid connection

Fourth Drove Eastern Industrial Estate grid connection is a grid connection in England, United Kingdom, with 8 MW of capacity, held by Valencia Waste Management Limited.

Map: where Fourth Drove Eastern Industrial Estate grid connection lies
52.5753, -0.2062 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Peterborough Central 11kV)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusOperating (connected)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderValencia Waste Management LimitedUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Attached toPeterborough EfW (matched by coordinates+technology+capacity+company, 0.23 km away)Rare Context entity resolution · CC0 1.0 · checked 25 Oct 2026
Capacity8 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologyWasteUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Connection date23 Jul 2015UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage11 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates52.5753, -0.2062UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Latest events

Dated events about this grid connection and the records linked to it from official notices, registers and owners' press releases, newest first. All recent changes.

  1. Commissioned: Peterborough EfW
  2. Permit granted: Peterborough EfW (planning authority Peterborough, reference 09/00078/MMFUL)
  3. Permit applied for: Peterborough EfW (planning authority Peterborough, reference 09/00078/MMFUL)

How it compares

Fourth Drove Eastern Industrial Estate grid connection is the 1,974th-largest of 3,539 grid connections in England and the 2,783rd-largest of 4,870 in the United Kingdom by capacity; its 8 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England1,974th of 3,539341,715 MW<0.1%
United Kingdom2,783rd of 4,870467,981 MW<0.1%
All grid connections in our data6,446th of 8,6181,355,288 MW<0.1%

Nearby

Within 50 km of this grid connection: 392 power plants (139 operating, 4,879 MW), 68 substations, 6 data centers and 3 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Peterborough EfWPower plant7.3 MWOperating0.2 km
Peterborough Energy Park (Green Energy Parks - Gasification)Power plant81 MWCancelled0.4 km
Peterborough Power Station PPL2 Gas EnginesPower plant49 MWOperating0.5 km
Peterborough East Grid 11kVSubstation——1.5 km
Peterborough Central 11kVSubstation——2.6 km
Peterborough Central 33kVSubstation——2.7 km
Data center, England (OSM way 87850427)Data center——4.4 km
Positive ParkData center——18 km
The Horizon CentreData center——30 km

Holder, grid operator and place

More from Valencia Waste Management Limited

Other grid connections in England

All 4837 grid connections in England, United Kingdom

Data on this page