Data center · England, United Kingdom
CapitalLand - Croyden
CapitalLand - Croyden is a data center in England, United Kingdom, operated by CapitaLand Ascendas REIT.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | England | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Operator | CapitaLand Ascendas REIT | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Website | https://www.capitaland-ascendasreit.com/en/our-portfolio/united-kingdom---europe/data-centres/croydon.html | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Building footprint | 6,545 m² (building) | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Coordinates | 51.3846, -0.1374 | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
Research on this data center and its operator.Who owns it up to the parent company, its power supply, grid connection and planning status, and an introduction to the operator.
Request researchHow its operator compares
CapitaLand Ascendas REIT operates 5 of the 191 data centers in the United Kingdom in our data with a named owner; 5 owners have more. Counts cover the data centers in our data that name an owner, holder or operator; an asset with several owners counts for each.
| Operator in United Kingdom | Rank | Data centers | Share |
|---|---|---|---|
| Equinix, Inc. | 1st | 13 | 6.8% |
| Digital Realty | 2nd | 10 | 5.2% |
| Virtus | 2nd | 10 | 5.2% |
| Pulsant | 4th | 8 | 4.2% |
| NTT Limited | 5th | 6 | 3.1% |
| CapitaLand Ascendas REIT | 6th | 5 | 2.6% |
Nearby
Within 50 km of this data center: 342 power plants (120 operating, 1,948 MW), 123 substations, 48 grid connections (30 operating, 313 MW), 1 transmission line and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Beddington EfW | Power plant | 26 MW | Operating | 0.6 km |
| Beddington AD Facility (Waste AD) | Power plant | 2 MW | Cancelled | 0.8 km |
| Willow Lane Wind Turbines | Power plant | 11 MW | Cancelled | 1.5 km |
| Ariel Way White City London grid connection | Grid connection | 2.2 MW | Operating | 15 km |
| Harvard lane Primary | Substation | — | — | 15 km |
| Tertiary Study grid connection | Grid connection | 57 MW | Planned | 15 km |
| Southfield Road Primary | Substation | — | — | 16 km |
| Goldsmiths Primary | Substation | — | — | 16 km |
| Brentford F C Training Ground 100 grid connection | Grid connection | 120 MW | Planned | 19 km |
Operator and place
More from CapitaLand Ascendas REIT
- Hertfordshire Data Centredata center
- CapitaLand Ascendas REIT data center, High Wycombedata center
- The Chess Buildingdata center
- Lunar 1&2data center
Other data centers in England
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.