CapitalLand - Croyden is a data center in England, United Kingdom, operated by CapitaLand Ascendas REIT.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEnglandOpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026
OperatorCapitaLand Ascendas REITOpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026
Websitehttps://www.capitaland-ascendasreit.com/en/our-portfolio/united-kingdom---europe/data-centres/croydon.htmlOpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026
Building footprint6,545 m² (building)OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026
Coordinates51.3846, -0.1374OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026

Research on this data center and its operator.Who owns it up to the parent company, its power supply, grid connection and planning status, and an introduction to the operator.

Request research

How its operator compares

CapitaLand Ascendas REIT operates 5 of the 191 data centers in the United Kingdom in our data with a named owner; 5 owners have more. Counts cover the data centers in our data that name an owner, holder or operator; an asset with several owners counts for each.

Operator in United KingdomRankData centersShare
Equinix, Inc.1st136.8%
Digital Realty2nd105.2%
Virtus2nd105.2%
Pulsant4th84.2%
NTT Limited5th63.1%
CapitaLand Ascendas REIT6th52.6%

Nearby

Within 50 km of this data center: 342 power plants (120 operating, 1,948 MW), 123 substations, 48 grid connections (30 operating, 313 MW), 1 transmission line and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Beddington EfWPower plant26 MWOperating0.6 km
Beddington AD Facility (Waste AD)Power plant2 MWCancelled0.8 km
Willow Lane Wind TurbinesPower plant11 MWCancelled1.5 km
Ariel Way White City London grid connectionGrid connection2.2 MWOperating15 km
Harvard lane PrimarySubstation——15 km
Tertiary Study grid connectionGrid connection57 MWPlanned15 km
Southfield Road PrimarySubstation——16 km
Goldsmiths PrimarySubstation——16 km
Brentford F C Training Ground 100 grid connectionGrid connection120 MWPlanned19 km

Operator and place

More from CapitaLand Ascendas REIT

Other data centers in England

All 245 data centers in England, United Kingdom