Data center · England, United Kingdom

Asanti Manchester

Asanti Manchester is a data center in England, United Kingdom, operated by Asanti.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEnglandOpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026
AddressFaulkner Street, Manchester, M1 4EHOpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026
OperatorAsantiOpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026
Coordinates53.4789, -2.2386OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026

Research on this data center and its operator.Who owns it up to the parent company, its power supply, grid connection and planning status, and an introduction to the operator.

Request research

How its operator compares

Asanti operates 3 of the 191 data centers in the United Kingdom in our data with a named owner; 12 owners have more. Counts cover the data centers in our data that name an owner, holder or operator; an asset with several owners counts for each.

Operator in United KingdomRankData centersShare
Equinix, Inc.1st136.8%
Digital Realty2nd105.2%
Virtus2nd105.2%
Pulsant4th84.2%
NTT Limited5th63.1%
Asanti13th31.6%

Nearby

Within 50 km of this data center: 433 substations, 396 grid connections (219 operating, 2,025 MW), 384 power plants (105 operating, 1,046 MW) and 3 gas storage facilities, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Dickinson St T11 & T12Substation——0.2 km
Dickinson St T13Substation——0.2 km
Bloom St BSPSubstation——0.3 km
Energy Centre grid connectionGrid connection5.68 MWOperating0.6 km
7 Market Street grid connectionGrid connection2.16 MWOperating0.6 km
Dial House grid connectionGrid connection4.14 MWOperating0.9 km
Ardwick Railway Goods Yard Incinerator (Newhaven EFW Plant)Power plant33.5 MWOperating2.3 km
City of Manchester StadiumPower plant2 MWCancelled2.8 km
City Football Academy, Ashton New Road - Solar panelsPower plant3.38 MWOperating3.2 km

Operator and place

More from Asanti

Other data centers in England

All 245 data centers in England, United Kingdom