Power plant · Runnymede, England, United Kingdom

Twynersh Meadows, Thorpe Road - Solar Park & Battery Storage

Twynersh Meadows, Thorpe Road - Solar Park & Battery Storage is a planned power plant in Runnymede, England, United Kingdom, with 5.5 MW of capacity, operated by Runnymede Borough Council.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationRunnymede (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressTwynersh Meadows Land west of Thorpe Road and north of St Anns Road, KT16 9EJDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date24 Jul 2025 (reference RU.25/0843, planning authority Runnymede)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorRunnymede Borough CouncilDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity5.5 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area9.81 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.3951, -0.5121DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit applied for (planning authority Runnymede, reference RU.25/0843)

How it compares

Twynersh Meadows, Thorpe Road - Solar Park & Battery Storage is the 1,602nd-largest of 2,174 power plants planned, permitted or under construction in England and the 2,472nd-largest of 3,222 in the United Kingdom by capacity; its 5.5 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,602nd of 2,174185,888 MW<0.1%
United Kingdom2,472nd of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data5,599th of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 192 substations, 152 data centers (1 operating, 88 MW), 120 grid connections (66 operating, 724 MW) and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Waste 3.325 MW grid connection at CausewayGrid connection3.33 MWOperating1.8 km
Laleham GSPSubstation——4.4 km
Causeway PrimarySubstation——4.5 km
Sidney Road PrimarySubstation——4.5 km
Ready - 200MW Battery grid connectionGrid connection200 MWPlanned5.0 km
Generation 1.7 MW grid connection at Sunbury CrossGrid connection1.7 MWOperating5.0 km
Redcentric ByfleetData center——5.7 km
Ark Data Centres - Longcross ParkData center——6.0 km
Serverfarm LON1 – London Data CenterData center——7.0 km