Data center · England, United Kingdom

Redcentric Byfleet

Redcentric Byfleet is a data center in England, United Kingdom, operated by Redcentric.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEnglandOpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026
OperatorRedcentricOpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026
Building footprint1,145 m² (building)OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026
Coordinates51.3476, -0.4799OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026

Research on this data center and its operator.Who owns it up to the parent company, its power supply, grid connection and planning status, and an introduction to the operator.

Request research

How its operator compares

Redcentric operates 5 of the 191 data centers in the United Kingdom in our data with a named owner; 5 owners have more. Counts cover the data centers in our data that name an owner, holder or operator; an asset with several owners counts for each.

Operator in United KingdomRankData centersShare
Equinix, Inc.1st136.8%
Digital Realty2nd105.2%
Virtus2nd105.2%
Pulsant4th84.2%
NTT Limited5th63.1%
Redcentric6th52.6%

Nearby

Within 50 km of this data center: 281 power plants (93 operating, 759 MW), 191 substations, 115 grid connections (61 operating, 686 MW) and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Redhill Road Biomass Power PlantPower plant2.5 MWCancelled2.9 km
Mclaren Technology Centre, Chertsey Road - Solar PanelsPower plant2.56 MWPermitted4.3 km
Twynersh Meadows, Thorpe Road - Solar Park & Battery StoragePower plant5.5 MWPlanned5.7 km
Ready - 200MW Battery grid connectionGrid connection200 MWPlanned6.8 km
Generation 1.7 MW grid connection at Sunbury CrossGrid connection1.7 MWOperating6.9 km
Waste 3.7 MW grid connection at Sunbury CrossGrid connection3.7 MWOperating6.9 km
Laleham GSPSubstation——8.6 km
MVEE PrimarySubstation——8.7 km
Chobham PrimarySubstation——8.8 km