Grid connection · England, United Kingdom

Horton Quarry Gen1 grid connection

Horton Quarry Gen1 grid connection is a grid connection in England, United Kingdom, with 1.85 MW of capacity, held by Valencia Waste Management Limited.

Map: where Horton Quarry Gen1 grid connection lies
50.8980, -0.2867 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Steyning 11kV)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusOperating (connected)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderValencia Waste Management LimitedUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Attached toHorton Landfill Site (matched by shared name+coordinates+technology+capacity+company, 0.16 km away)Rare Context entity resolution · CC0 1.0 · checked 25 Oct 2026
Capacity1.85 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologyLandfill gasUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorSouth Eastern Power Networks plc (UK Power Networks, South East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Connection date4 Jan 1997UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage11 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates50.8980, -0.2867UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Latest events

Dated events about this grid connection and the records linked to it from official notices, registers and owners' press releases, newest first. All recent changes.

  1. Commissioned: Horton Landfill Site
  2. Permit granted: Horton Landfill Site (planning authority Horsham)
  3. Permit applied for: Horton Landfill Site (planning authority Horsham)

How it compares

Horton Quarry Gen1 grid connection is the 3,101st-largest of 3,539 grid connections in England and the 4,299th-largest of 4,870 in the United Kingdom by capacity; its 1.85 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England3,101st of 3,539341,715 MW<0.1%
United Kingdom4,299th of 4,870467,981 MW<0.1%
All grid connections in our data8,034th of 8,6181,355,288 MW<0.1%

Nearby

Within 50 km of this grid connection: 146 substations, 134 power plants (59 operating, 1,114 MW) and 11 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Horton Landfill SitePower plant2 MWOperating0.2 km
Horton Landfill Site, Henfield Road - Solar PanelsPower plant12.5 MWPlanned0.2 km
Steyning Battery Energy Storage FacilityPower plant18 MWCancelled1.8 km
Steyning 11kVSubstation——1.9 km
Steyning Grid 33kVSubstation——2.3 km
North Shoreham 11kVSubstation——6.5 km
IBM HorshamData center——14 km
Digital Realty LGW15Data center——27 km
Digital Realty LGW16Data center——27 km

Holder, grid operator and place