Gowy Landfill 5 grid connection

Gowy Landfill 5 grid connection is a planned grid connection in England, United Kingdom, with 8 MW of capacity, held by Infinis.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connection site: CHESTER MAIN GT4 / CRANE BANK GT1 / GUILDEN SUTTON GT1 / SALTNEY G2A)SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (Accepted to Connect)SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
HolderInfinisSP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity8 MWSP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologySolarSP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorSP ManwebSP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date1 Dec 2030 (target energisation)SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its holder? Ask us.

How it compares

Gowy Landfill 5 grid connection is the 1,436th-largest of 2,533 grid connections in England and the 2,274th-largest of 3,903 in the United Kingdom by capacity; its 8 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England1,436th of 2,533319,370 MW<0.1%
United Kingdom2,274th of 3,903446,745 MW<0.1%
All grid connections in our data5,901st of 7,6161,281,251 MW<0.1%

Holder, grid operator and place

More from Infinis

Other grid connections in England

All 3831 grid connections in England, United Kingdom

Data on this page