Data center · England, United Kingdom

nLighten Edge Data Centre Liverpool

nLighten Edge Data Centre Liverpool is a data center in England, United Kingdom.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEnglandOpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026
Websitehttps://www.nlighten.eu/en/united-kingdom-data-centers/liverpool/OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026
Building footprint16,168 m² (site outline)OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026
Coordinates53.3433, -2.9733OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026

Research on this data center and its owner.Who owns it up to the parent company, its power supply, grid connection and planning status, and an introduction to the owner.

Request research

Nearby

Within 50 km of this data center: 340 power plants (107 operating, 2,284 MW), 155 grid connections (89 operating, 699 MW), 143 substations, 3 gas storage facilities and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Bromborough DockPower plant3.7 MWOperating0.7 km
Bromborough Dock Landfill SchemePower plant3 MWOperating1.5 km
Eastham Balacing Services PlantPower plant27 MWCancelled3.3 km
Bold GSPSubstation——21 km
Bickerstaffe WTW grid connectionGrid connection1.25 MWOperating22 km
Billinge Hill Quarry Landfill grid connectionGrid connection1.03 MWOperating24 km
Amazon Man 8 grid connectionGrid connection1.39 MWPlanned25 km
PimboSubstation——25 km
OrmskirkSubstation——26 km

Place

Other data centers in England

All 245 data centers in England, United Kingdom

Data on this page