Grid connection · England, United Kingdom

Solar 17.3 MW grid connection at Marston Road Grid 33kV

Solar 17.3 MW grid connection at Marston Road Grid 33kV is a planned grid connection in England, United Kingdom, with 17.3 MW of capacity, held by Infinis Limited.

Map: where Solar 17.3 MW grid connection at Marston Road Grid 33kV lies
52.0697, -0.5234 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Marston Road Grid 33kV)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusPlanned (accepted to connect)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderInfinis LimitedUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Capacity17.3 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologySolarUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Queue date8 Dec 2022UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Connection date31 Oct 2031 (target energisation)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage33 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates52.0697, -0.5234UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

How it compares

Solar 17.3 MW grid connection at Marston Road Grid 33kV is the 1,506th-largest of 3,539 grid connections in England and the 2,149th-largest of 4,870 in the United Kingdom by capacity; its 17.3 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England1,506th of 3,539341,715 MW<0.1%
United Kingdom2,149th of 4,870467,981 MW<0.1%
All grid connections in our data5,694th of 8,6181,355,288 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Nearby

Within 50 km of this grid connection: 457 power plants (160 operating, 2,304 MW), 163 substations and 17 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Rookery SouthPower plant65 MWOperating0.7 km
Marston Vale Country Park Wind TurbinePower plant1.5 MWOperating0.8 km
Green Lane, Stewartby - Solar PV ArrayPower plant30 MWPlanned0.8 km
Marston Rd Grid 33kVSubstation——1.0 km
Marston Rd Primary 11kVSubstation——1.2 km
West Bedford Primary 11kVSubstation——4.3 km
Pulsant Milton Keynes SE-1Data center——16 km
Data center, England (OSM way 460010263)Data center——16 km
Data center, Dunstable (OSM way 526426719)Data center——19 km