Grid connection · England, United Kingdom

Sutton Courtenay grid connection

Sutton Courtenay grid connection is a planned grid connection in England, United Kingdom, with 12.5 MW of capacity, held by Infinis.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceSUTTON COURTENAY grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationEngland (connects at Sutton Courtney)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
HolderInfinisSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toDrayton BSP (via a bulk supply point)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity12.5 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologySolarSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyLandfill gasSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorSouthern Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date17 Nov 2021SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date23 Jun 2028 (target energisation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates51.6395, -1.2595SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

How it compares

Sutton Courtenay grid connection is the 1,259th-largest of 2,533 grid connections in England and the 1,998th-largest of 3,903 in the United Kingdom by capacity; its 12.5 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England1,259th of 2,533319,370 MW<0.1%
United Kingdom1,998th of 3,903446,745 MW<0.1%
All grid connections in our data5,833rd of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Nearby

Within 50 km of this grid connection: 318 power plants (112 operating, 1,670 MW), 204 substations and 60 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Sutton CourtneyPower plant6 MWOperating0.8 km
Sutton Courtenay Landfill SchemePower plant5.6 MWOperating0.9 km
Appleford Sidings, Sutton Courtenay - Solar Photovoltaic ArrayPower plant24 MWPlanned1.0 km
Milton PrimarySubstation——2.1 km
AWS Didcot Data CentreData center——2.5 km
Culham PrimarySubstation——3.0 km
Winsmore Lane PrimarySubstation——3.8 km
R89Data center——8.2 km
University Shared Data CentreData center——13 km

Holder, grid operator and place

More from Infinis

Other grid connections in England

All 3831 grid connections in England, United Kingdom