Wervin Road, Wervin - Solar PV Panels is a planned solar power plant in Cheshire West and Chester, England, United Kingdom, with 3.51 MW of capacity, operated by North England Zoological Department.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationCheshire West and Chester (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressSouth of Wervin Road Wervin, CH2 4BRDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date1 Apr 2026 (reference 26/00530/FUL, planning authority Cheshire West and Chester)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorNorth England Zoological Department (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity3.51 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area4.77 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates53.2376, -2.8658DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit applied for (planning authority Cheshire West and Chester, reference 26/00530/FUL)

How it compares

Wervin Road, Wervin - Solar PV Panels is the 1,357th-largest of 1,650 power plants planned, permitted or under construction in England and the 2,163rd-largest of 2,548 in the United Kingdom by capacity; its 3.51 MW is <0.1% of the 279,068 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,357th of 1,650171,264 MW<0.1%
United Kingdom2,163rd of 2,548279,068 MW<0.1%
All power plants planned, permitted or under construction in our data5,339th of 5,799657,076 MW<0.1%

Nearby

Within 50 km of this power plant: 148 grid connections (90 operating, 625 MW), 147 substations, 17 data centers, 3 gas storage facilities and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
nLighten ChesterData center——4.3 km
The Babbage CentreData center——13 km
nLighten Edge Data Centre LiverpoolData center——14 km
Bold GSPSubstation——25 km
Keuper Underground Gas Storage Facility Material Change 1Gas storage facility—Planned28 km
Unit 1 Junction Lane grid connectionGrid connection5.26 MWPlanned28 km
Keuper Gas Storage ProjectGas storage facility—Permitted28 km
Newton Le WillowsSubstation——29 km
Parkside Railway Station grid connectionGrid connection3 MWOperating29 km