Grid connection · England, United Kingdom
Sutton Courtenay Landfill Site grid connection
Sutton Courtenay Landfill Site grid connection is a grid connection in England, United Kingdom, with 14.3 MW of capacity, held by Infinis.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Name in the source | SUTTON COURTENAY LANDFILL SITE grid connection | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Location | England (connects at Sutton Courtney) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Status | Operating (connected) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Holder | Infinis | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Attached to | Drayton BSP (via a bulk supply point) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Capacity | 14.3 MW | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Technology | Landfill gas | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Grid operator | Southern Electric Power Distribution plc | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Voltage | 33 kV | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Coordinates | 51.6395, -1.2595 | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.
Request researchHow it compares
Sutton Courtenay Landfill Site grid connection is the 1,222nd-largest of 2,533 grid connections in England and the 1,935th-largest of 3,903 in the United Kingdom by capacity; its 14.3 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 1,222nd of 2,533 | 319,370 MW | <0.1% |
| United Kingdom | 1,935th of 3,903 | 446,745 MW | <0.1% |
| All grid connections in our data | 5,755th of 7,928 | 1,372,494 MW | <0.1% |
Nearby
Within 50 km of this grid connection: 318 power plants (112 operating, 1,670 MW), 204 substations and 60 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Sutton Courtney | Power plant | 6 MW | Operating | 0.8 km |
| Sutton Courtenay Landfill Scheme | Power plant | 5.6 MW | Operating | 0.9 km |
| Appleford Sidings, Sutton Courtenay - Solar Photovoltaic Array | Power plant | 24 MW | Planned | 1.0 km |
| Milton Primary | Substation | — | — | 2.1 km |
| AWS Didcot Data Centre | Data center | — | — | 2.5 km |
| Culham Primary | Substation | — | — | 3.0 km |
| Winsmore Lane Primary | Substation | — | — | 3.8 km |
| R89 | Data center | — | — | 8.2 km |
| University Shared Data Centre | Data center | — | — | 13 km |
Holder, grid operator and place
More from Infinis
- Sutton Courtenay grid connection12.5 MW
- Gowy Landfill 5 grid connection8 MW
- Waste 2.375 MW grid connection at CALNE2.38 MW
- Landfill gas 1.9 MW grid connection at Chichester1.9 MW
- Pancross & Oaklands Solar Farm50 MW · under construction
- Pancross & Oaklands Solar Farm50 MW · under construction
- A'Chruach (Phase 1)48.3 MW
- Bishampton Solar Farm30 MW · under construction
Other grid connections in England
- Bute Hydrogen Project 1 grid connection4,800 MW
- Drax BECCS grid connection3,906 MW
- Drax Power Station grid connection3,906 MW
- Bute Hydrogen Project 2 grid connection3,600 MW
- Bute Hydrogen Project 3 grid connection3,600 MW
- Bute Hydrogen Project 5 grid connection3,600 MW
- Bute Hydrogen Project 6 grid connection3,600 MW
- Hinkley Point C grid connection3,340 MW
Data on this page
- California ISO. CAISO queue report, CAISO Privacy and Terms of Use.
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- NYISO interconnection queue. NYISO interconnection queue, Free reuse.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- PJM New Services Queue. PJM New Services Queue, Free reuse.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.