Power plant · Stockton-on-Tees, England, United Kingdom

Cowpen Bewley, Seal Sands Link Road - Battery Energy Storage

Cowpen Bewley, Seal Sands Link Road - Battery Energy Storage is a planned power plant in Stockton-on-Tees, England, United Kingdom, with 200 MW of capacity, operated by Harmony Energy Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationStockton-on-Tees (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressCowpen Bewley, Seal Sands Link Road, Middlesbrough, TS2 1UADESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date22 Jan 2025 (reference 24/2141/FUL, planning authority Stockton-on-Tees)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorHarmony Energy LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity200 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates54.6107, -1.1649DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit applied for (planning authority Stockton-on-Tees, reference 24/2141/FUL)

How it compares

Cowpen Bewley, Seal Sands Link Road - Battery Energy Storage is the 177th-largest of 2,174 power plants planned, permitted or under construction in England and the 279th-largest of 3,222 in the United Kingdom by capacity; its 200 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England177th of 2,174185,888 MW0.11%
United Kingdom279th of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data741st of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 241 grid connections (123 operating, 1,230 MW), 135 substations and 4 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Tees Industrial T1 T2Substation——0.5 km
Gas 4 MW grid connection at Tees Industrial T1 T2Grid connection4 MWOperating0.7 km
Generation 4.4 MW grid connection at Tees Industrial T3 T4Grid connection4.4 MWOperating0.7 km
Gas 50 MW grid connection at Phillips PetroleumGrid connection50 MWPlanned0.9 km
Seal SandsSubstation——2.4 km
Greatham DirectSubstation——3.3 km
Lumen Technologies data center, MiddlesbroughData center——5.8 km
Data center, Redcar (OSM way 1055031579)Data center——8.8 km
DXC Wynyard Data CenterData center——9.7 km

Operator and place

More from Harmony Energy Limited

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page