Power plant · Stockton-on-Tees, England, United Kingdom
Cowpen Bewley, Seal Sands Link Road - Battery Energy Storage
Cowpen Bewley, Seal Sands Link Road - Battery Energy Storage is a planned power plant in Stockton-on-Tees, England, United Kingdom, with 200 MW of capacity, operated by Harmony Energy Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Stockton-on-Tees (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Cowpen Bewley, Seal Sands Link Road, Middlesbrough, TS2 1UA | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Planned (planning application submitted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 22 Jan 2025 (reference 24/2141/FUL, planning authority Stockton-on-Tees) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Harmony Energy Limited | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 200 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery (stand-alone storage) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 54.6107, -1.1649 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Permit applied for (planning authority Stockton-on-Tees, reference 24/2141/FUL)
How it compares
Cowpen Bewley, Seal Sands Link Road - Battery Energy Storage is the 177th-largest of 2,174 power plants planned, permitted or under construction in England and the 279th-largest of 3,222 in the United Kingdom by capacity; its 200 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 177th of 2,174 | 185,888 MW | 0.11% |
| United Kingdom | 279th of 3,222 | 300,461 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 741st of 6,455 | 664,040 MW | <0.1% |
Nearby
Within 50 km of this power plant: 241 grid connections (123 operating, 1,230 MW), 135 substations and 4 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Tees Industrial T1 T2 | Substation | — | — | 0.5 km |
| Gas 4 MW grid connection at Tees Industrial T1 T2 | Grid connection | 4 MW | Operating | 0.7 km |
| Generation 4.4 MW grid connection at Tees Industrial T3 T4 | Grid connection | 4.4 MW | Operating | 0.7 km |
| Gas 50 MW grid connection at Phillips Petroleum | Grid connection | 50 MW | Planned | 0.9 km |
| Seal Sands | Substation | — | — | 2.4 km |
| Greatham Direct | Substation | — | — | 3.3 km |
| Lumen Technologies data center, Middlesbrough | Data center | — | — | 5.8 km |
| Data center, Redcar (OSM way 1055031579) | Data center | — | — | 8.8 km |
| DXC Wynyard Data Center | Data center | — | — | 9.7 km |
Operator and place
More from Harmony Energy Limited
- Flushing, Longside - Battery Energy Storage System400 MW · planned
- Rawfield Lane - Battery Energy Storage System200 MW · permitted
- Low Moor Lane, Scotton - Battery Energy Storage System200 MW · planned
- Barn Farm - Batter Energy Storage Facility200 MW · permitted
- Moat Lane, Wickersley - Battery Storage Facility100 MW · permitted
- Neil Fox Way - Battery Storage99.9 MW · planned
- Neil Fox Way - Battery Storage99.9 MW · planned
- Darlington Road, Skeeby55 MW
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.