Power plant · West Oxfordshire, England, United Kingdom

Caswell Lane, Brize Norton - Solar Farm & Battery Storage

Caswell Lane, Brize Norton - Solar Farm & Battery Storage is a planned power plant in West Oxfordshire, England, United Kingdom, with 30 MW of capacity, operated by Ampyr Solar Europe.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationWest Oxfordshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressCaswell Lane Brize Norton, OX18 3NJDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date30 Jan 2025 (reference 24/03278/FUL, planning authority West Oxfordshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorAmpyr Solar EuropeDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity30 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area46 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.7744, -1.5384DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

How it compares

Caswell Lane, Brize Norton - Solar Farm & Battery Storage is the 991st-largest of 2,174 power plants planned, permitted or under construction in England and the 1,569th-largest of 3,222 in the United Kingdom by capacity; its 30 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England991st of 2,174186,088 MW<0.1%
United Kingdom1,569th of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data2,981st of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 160 grid connections (87 operating, 985 MW), 119 substations and 9 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
29.9MW EHV PV & BESS grid connectionGrid connection62.4 MWPlanned0.3 km
Windrush Park PrimarySubstation——1.9 km
Ducklington Solar grid connectionGrid connection18 MWPlanned2.3 km
Westerfield Farm grid connectionGrid connection9.41 MWOperating3.2 km
Witney BSPSubstation——3.7 km
Carterton PrimarySubstation——3.7 km
University Shared Data CentreData center——20 km
nLighten SwindonData center——23 km
AWS Didcot Data CentreData center——26 km

Operator and place

More from Ampyr Solar Europe

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page