RARE CONTEXT Request research

Grid connection · England, United Kingdom

Caddington Solar grid connection

Caddington Solar grid connection is a grid connection in England, United Kingdom, with 5 MW of capacity, held by BCL Gwynt Limited.

Map: where Caddington Solar grid connection lies
51.8549, -0.4645 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Caddington Primary 11kV)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusOperating (connected)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderBCL Gwynt LimitedUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Attached toCaddington Primary 11kV (via a primary substation)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Attached toCaddington Solar Farm (Phase 2) (matched by shared name+coordinates+technology+capacity, 0.23 km away)Rare Context entity resolution · CC0 1.0 · checked 25 Oct 2026
Capacity5 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologySolarUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Connection date19 Nov 2014UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage11 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates51.8549, -0.4645UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Latest events

Dated events about this grid connection and the records linked to it from official notices, registers and owners' press releases, newest first. All recent changes.

  1. Commissioned: Caddington Solar Farm (Phase 2)
  2. Permit granted: Caddington Solar Farm (Phase 2) (planning authority Central Bedfordshire, reference CB/14/04064)
  3. Permit applied for: Caddington Solar Farm (Phase 2) (planning authority Central Bedfordshire, reference CB/14/04064)

How it compares

Caddington Solar grid connection is the 2,306th-largest of 3,539 grid connections in England and the 3,191st-largest of 4,870 in the United Kingdom by capacity; its 5 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England2,306th of 3,539341,715 MW<0.1%
United Kingdom3,191st of 4,870467,981 MW<0.1%
All grid connections in our data6,884th of 8,6181,355,288 MW<0.1%

Nearby

Within 50 km of this grid connection: 417 power plants (149 operating, 3,657 MW), 409 substations, 112 data centers (1 operating, 88 MW), 1 transmission line and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Caddington Solar Farm (Phase 2)Power plant5 MWOperating0.2 km
Caddington Solar Farm (Phase 1)Power plant3 MWOperating0.7 km
Caddington Primary 11kVSubstation——0.8 km
Watling Street, Caddington - Solar FarmPower plant19.7 MWPermitted1.1 km
Capability Green Primary 11kVSubstation——4.0 km
Chaul End Primary 11kVSubstation——4.1 km
Data center, Dunstable (OSM way 526426719)Data center——5.4 km
NTT Hemel Hempstead 2Data center——10 km
NTT Hemel Hempstead 3Data center——11 km

Holder, grid operator and place

Other grid connections in England

All 4837 grid connections in England, United Kingdom