Power plant · Central Bedfordshire, England, United Kingdom

Caddington Solar Farm (Phase 1)

Caddington Solar Farm (Phase 1) is a power plant in Central Bedfordshire, England, United Kingdom, with 3 MW of capacity, operated by Raybridge Corporation.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationCentral Bedfordshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressMillfield Farm, Caddington, Bedfordshire, LU1 4EHDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2014DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date24 May 2011 (permit CB/11/00455/FULL, Town and Country Planning Act, issued by Central Bedfordshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date9 Feb 2011 (reference CB/11/00455/FULL, planning authority Central Bedfordshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date24 May 2011 (granted, reference CB/11/00455/FULL, planning authority Central Bedfordshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorRaybridge CorporationDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity3 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area11.4 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.8605, -0.4601DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

How it compares

Caddington Solar Farm (Phase 1) is the 2,525th-largest of 3,430 power plants in England and the 3,739th-largest of 5,050 in the United Kingdom by capacity; its 3 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England2,525th of 3,43071,985 MW<0.1%
United Kingdom3,739th of 5,050115,642 MW<0.1%
All power plants in our data9,653rd of 12,0081,173,302 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Permit issued (Town and Country Planning Act), no. CB/11/00455/FULL
  2. Started operating

Nearby

Within 50 km of this power plant: 108 data centers (1 operating, 88 MW), 100 substations, 48 grid connections (25 operating, 282 MW), 1 transmission line and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Data center, Dunstable (OSM way 526426719)Data center——5.0 km
NTT Hemel Hempstead 2Data center——11 km
NTT Hemel Hempstead 3Data center——11 km
Cokes Lane PrimarySubstation——23 km
Amersham GSPSubstation——26 km
Generation 99 MW grid connection at Amersham MainGrid connection99 MWPlanned26 km
Harefield PrimarySubstation——28 km
Harefield Solar grid connectionGrid connection30 MWPlanned30 km
Wapseys Wood grid connectionGrid connection2 MWOperating32 km

Operator and place

Other power plants in England

All 5809 power plants in England, United Kingdom