Power plant · Central Bedfordshire, England, United Kingdom

Caddington Solar Farm (Phase 2)

Caddington Solar Farm (Phase 2) is a power plant in Central Bedfordshire, England, United Kingdom, with 5 MW of capacity, operated by Emsrayne Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationCentral Bedfordshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressMillfield Farm, Millfield Lane, Caddington, Luton, LU1 4AJDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2016DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date2 Feb 2015 (permit CB/14/04064, Town and Country Planning Act, issued by Central Bedfordshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date21 Oct 2014 (reference CB/14/04064, planning authority Central Bedfordshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date2 Feb 2015 (granted, reference CB/14/04064, planning authority Central Bedfordshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorEmsrayne LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity5 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area9.3 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.8568, -0.4655DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its operator? Ask us.

How it compares

Caddington Solar Farm (Phase 2) is the 1,758th-largest of 3,430 power plants in England and the 2,742nd-largest of 5,050 in the United Kingdom by capacity; its 5 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England1,758th of 3,43071,985 MW<0.1%
United Kingdom2,742nd of 5,050115,642 MW<0.1%
All power plants in our data8,356th of 12,0081,173,302 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Permit issued (Town and Country Planning Act), no. CB/14/04064
  2. Started operating

Nearby

Within 50 km of this power plant: 121 grid connections (27 operating, 295 MW), 112 data centers (1 operating, 88 MW), 100 substations and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Data center, Dunstable (OSM way 526426719)Data center——5.2 km
NTT Hemel Hempstead 2Data center——10 km
NTT Hemel Hempstead 3Data center——11 km
Milton Keynes, Woburn Sands grid connectionGrid connection——22 km
Cokes Lane PrimarySubstation——22 km
Bletchley Landfill Site grid connectionGrid connection——23 km
34130902 grid connectionGrid connection——24 km
Amersham GSPSubstation——25 km
Harefield PrimarySubstation——28 km

Operator and place

Other power plants in England

All 5809 power plants in England, United Kingdom