Capability Green Primary 11kV Substation is an 11 kV primary substation in England, United Kingdom, with 11.4 MVA of demand headroom and 21 MVA of generation headroom, operated by Eastern Power Networks plc (UK Power Networks, East England licence area).

Map: where Capability Green Primary 11kV lies
51.8681, -0.4100 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEnglandUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Demand headroom11.4 MVAUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Generation headroom21 MVAUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Firm capacity24 MVAUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
LevelPrimary substationUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage11 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates51.8681, -0.4100UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this substation and the land around it.Its headroom, connection queue and congestion, who owns the land around it, and an introduction to those owners.

Nearby

Within 50 km of this substation: 420 power plants (152 operating, 3,729 MW), 315 grid connections (204 operating, 2,036 MW), 123 data centers (1 operating, 88 MW), 1 transmission line and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Land Around Chiltern Green And West Hyde Road grid connectionGrid connection23 MWPlanned3.4 km
Chiltern Green RoadPower plant10 MWCancelled3.5 km
Caddington Solar Farm (Phase 1)Power plant3 MWOperating3.5 km
Ld At Lawrence End Park &, Dane StreetPower plant5 MWOperating3.9 km
Caddington Solar grid connectionGrid connection5 MWOperating4.0 km
Millfield Farm grid connectionGrid connection5 MWOperating4.4 km
Data center, Dunstable (OSM way 526426719)Data center——7.1 km
NTT Hemel Hempstead 2Data center——12 km
NTT Hemel Hempstead 3Data center——12 km