Data center · England, United Kingdom
NTT Hemel Hempstead 3
NTT Hemel Hempstead 3 is a data center in England, United Kingdom, operated by NTT Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | England | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Address | Spring Way, Hemel Hempstead, HP2 7TN | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Operator | NTT Limited | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Website | https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/emea/hemel-hempstead-3-data-center | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Building footprint | 14,330 m² (building) | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Coordinates | 51.7620, -0.4365 | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
Research on this data center and its operator.Who owns it up to the parent company, its power supply, grid connection and planning status, and an introduction to the operator.
Request researchHow its operator compares
NTT Limited operates 6 of the 191 data centers in the United Kingdom in our data with a named owner; 4 owners have more. Counts cover the data centers in our data that name an owner, holder or operator; an asset with several owners counts for each.
| Operator in United Kingdom | Rank | Data centers | Share |
|---|---|---|---|
| Equinix, Inc. | 1st | 13 | 6.8% |
| Digital Realty | 2nd | 10 | 5.2% |
| Virtus | 2nd | 10 | 5.2% |
| Pulsant | 4th | 8 | 4.2% |
| NTT Limited | 5th | 6 | 3.1% |
Nearby
Within 50 km of this data center: 392 power plants (139 operating, 1,376 MW), 118 substations, 60 grid connections (32 operating, 335 MW), 1 transmission line and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| G Park Maxted Road - Solar Panels | Power plant | 1.25 MW | Permitted | 0.6 km |
| Amazon Boundary Way | Power plant | 2 MW | Cancelled | 0.8 km |
| Flamsteadbury Farm | Power plant | 4.5 MW | Cancelled | 3.7 km |
| Cokes Lane Primary | Substation | — | — | 14 km |
| Harefield Primary | Substation | — | — | 17 km |
| Generation 99 MW grid connection at Amersham Main | Grid connection | 99 MW | Planned | 18 km |
| Amersham GSP | Substation | — | — | 19 km |
| Harefield Solar grid connection | Grid connection | 30 MW | Planned | 19 km |
| Gerrards Cross Battery grid connection | Grid connection | 20 MW | Operating | 22 km |
Operator and place
More from NTT Limited
- NTT Global Datacenters Frankfurt 4data center
- NTT Data Business Solutions Global Managed Servicesdata center
- NTT Slough 2data center
- NTT Slough 3data center
- NTT Hemel Hempstead 2data center
- NTT London 1data center
- NTTdata center
- NTT Hemel Hempstead 4data center
Other data centers in England
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.