Windmill Farm Solar Farm (Old Malton) is a permitted power plant in North Yorkshire, England, United Kingdom, with 12.6 MW of capacity, operated by Harmony Energy.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationNorth Yorkshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressGreat Sike Road, YO17 6SBDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (appeal granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date25 Feb 2025 (permit 23/00046/MFULE, Town and Country Planning Act, issued by North Yorkshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date25 Jan 2023 (ref. 23/00046/MFULE, North Yorkshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date17 Oct 2023 (refused, ref. 23/00046/MFULE, North Yorkshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date25 Feb 2025 (appeal granted, ref. 23/00046/MFULE, North Yorkshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date25 Feb 2025 (granted, ref. 23/00046/MFULE, North Yorkshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorHarmony EnergyDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity12.6 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBatteryDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates54.1642, -0.7924DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its operator? Ask us.

How it compares

Windmill Farm Solar Farm (Old Malton) is the 1,404th-largest of 2,174 power plants planned, permitted or under construction in England and the 2,182nd-largest of 3,222 in the United Kingdom by capacity; its 12.6 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,404th of 2,174186,088 MW<0.1%
United Kingdom2,182nd of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data4,885th of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 174 grid connections (78 operating, 1,050 MW), 81 substations and 3 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Battery storage and Solar 61.9 MW grid connection at Harmony BESSGrid connection61.9 MWPlanned1.0 km
Malton GridSubstation——1.7 km
MaltonSubstation——2.5 km
Gas 2.5 MW grid connection at MaltonGrid connection2.5 MWOperating3.5 km
Solar 40 MW grid connection at Deerholme Farm SolarGrid connection40 MWPlanned4.1 km
Thornton DaleSubstation——8.1 km
Morven Hawthorn Pit Grid Connection ProjectTransmission line—Planned35 km
Yorkshire GREENTransmission line—Permitted43 km
Continental Link Multi-Purpose InterconnectorTransmission line—Cancelled47 km