Grid connection · England, United Kingdom
Baker Barracks - PV grid connection
Baker Barracks - PV grid connection is a planned grid connection in England, United Kingdom, with 1.2 MW of capacity, held by Public Power Solutions.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Name in the source | BAKER BARRACKS - PV grid connection | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Location | England (connects at Emsworth) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Status | Planned (accepted to connect) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Holder | Public Power Solutions | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Attached to | Emsworth Primary (via a primary substation) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Attached to | Baker Barracks Solar Development (matched by name+coordinates+technology+capacity, 0.21 km away) | Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026 |
| Capacity | 1.2 MW | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Technology | Solar | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Grid operator | Southern Electric Power Distribution plc | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Queue date | 9 Aug 2022 | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Voltage | 11 kV | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Coordinates | 50.8207, -0.9239 | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.
Request researchHow it compares
Baker Barracks - PV grid connection is the 2,404th-largest of 2,533 grid connections in England and the 3,715th-largest of 3,903 in the United Kingdom by capacity; its 1.2 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 2,404th of 2,533 | 319,370 MW | <0.1% |
| United Kingdom | 3,715th of 3,903 | 446,745 MW | <0.1% |
| All grid connections in our data | 7,731st of 7,928 | 1,372,494 MW | <0.1% |
Nearby
Within 50 km of this grid connection: 210 power plants (85 operating, 598 MW), 137 substations, 9 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Baker Barracks Solar Development | Power plant | 1.5 MW | Permitted | 0.2 km |
| Emsworth Primary | Substation | — | — | 3.1 km |
| Gable Head Primary | Substation | — | — | 4.7 km |
| Bedhampton Pumping Station, Meyrick Road - Battery Energy Storage | Power plant | 150 MW | Planned | 5.1 km |
| Southleigh Landfill | Power plant | 3.5 MW | Operating | 5.6 km |
| Brockhampton Primary | Substation | — | — | 5.8 km |
| SSE data center, Havant | Data center | — | — | 6.3 km |
| Aquind Interconnector | Transmission line | — | Planned | 13 km |
| ServerHouse | Data center | — | — | 17 km |
Holder, grid operator and place
More from Public Power Solutions
- Halewick Lane, Sompting - Battery-based Energy Storage Facility50 MW · under construction
- Braydon Manor Farm8.7 MW
- Brindley Close (Extension)6 MW · under construction
- Chapel Farm5 MW
- Common Farm4.8 MW
- Barnfield Solar Park2.5 MW
- Rock Barracks Solar Farm1.5 MW · under construction
Other grid connections in England
- Bute Hydrogen Project 1 grid connection4,800 MW
- Drax BECCS grid connection3,906 MW
- Drax Power Station grid connection3,906 MW
- Bute Hydrogen Project 2 grid connection3,600 MW
- Bute Hydrogen Project 3 grid connection3,600 MW
- Bute Hydrogen Project 5 grid connection3,600 MW
- Bute Hydrogen Project 6 grid connection3,600 MW
- Hinkley Point C grid connection3,340 MW
Data on this page
- California ISO. The terms cover every document on caiso.com, the cluster reports included. CAISO queue report, CAISO Privacy and Terms of Use.
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- NYISO interconnection queue. NYISO interconnection queue, Free reuse.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- PJM New Services Queue. PJM New Services Queue, Free reuse.
- Rare Context entity resolution. Rare Context entity resolution, CC0 1.0.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.