Owner · Company
Public Power Solutions
Public Power Solutions is linked to 8 assets and rights in the United Kingdom: it operates 7 power plants and holds a grid connection.
Portfolio
The 8 assets and rights Public Power Solutions owns, operates or holds, by class, with its role in each, across its 2 records. Sizes are the whole asset's, so they are not added up: the sources give no share for this owner.
Power plants 7
| Power plant | Location | Role | Capacity |
|---|---|---|---|
| Halewick Lane, Sompting - Battery-based Energy Storage Facility | Adur, England, United Kingdom | Operator | 50 MW |
| Braydon Manor Farm | Wiltshire, England, United Kingdom | Operator | 8.7 MW |
| Brindley Close (Extension) | Swindon, England, United Kingdom | Operator | 6 MW |
| Chapel Farm | Swindon, England, United Kingdom | Operator | 5 MW |
| Common Farm | Swindon, England, United Kingdom | Operator | 4.8 MW |
| Barnfield Solar Park | Swindon, England, United Kingdom | Operator | 2.5 MW |
| Rock Barracks Solar Farm | East Suffolk, England, United Kingdom | Operator | 1.5 MW |
Grid connections 1
| Grid connection | Location | Role | Capacity |
|---|---|---|---|
| Baker Barracks - PV grid connection | England, United Kingdom | Holder | 1.2 MW |
By country
Where the assets and rights are.
- The United Kingdom8 in 2 classes
Latest events
Dated events about Public Power Solutions and its assets from official notices and registers, newest first: the latest 8 of 19. All recent changes.
- Construction started: Halewick Lane, Sompting - Battery-based Energy Storage Facility
- Construction started: Brindley Close (Extension)
- Permit granted: Rock Barracks Solar Farm (planning authority East Suffolk, reference DC/20/1198/FUL)
- Permit granted: Brindley Close (Extension) (planning authority Swindon, reference S/20/0850)
- Permit applied for: Brindley Close (Extension) (planning authority Swindon, reference S/20/0850)
- Permit applied for: Rock Barracks Solar Farm (planning authority East Suffolk, reference DC/20/1198/FUL)
- Permit applied for: Halewick Lane, Sompting - Battery-based Energy Storage Facility (planning authority Adur, reference SDNP/18/06402/FUL)
- Commissioned: Barnfield Solar Park
Partners and counterparties
Owners, operators and grid operators on the same assets.
- Swindon Borough Council2 shared
- Southern Electric Power Distribution plc1 shared
- West Sussex County Council1 shared
Also recorded as
Sources name Public Power Solutions under 2 records; this page joins them. Links to any of them lead here.
| Name in the source | Identifier | Source |
|---|---|---|
| Public Power Solutions | party:name:public-power-solutions | DESNZ Renewable Energy Planning Database (REPD) |
| PUBLIC POWER SOLUTIONS LTD | party:name:public-power-solutions-ltd | SSEN Distribution data portal |
Research on Public Power Solutions.Its full portfolio, its parent companies, and an introduction to the people who decide on buying and selling.
Request researchData on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Rare Context entity resolution. Rare Context entity resolution, CC0 1.0.