Power plant · Adur, England, United Kingdom

Halewick Lane, Sompting - Battery-based Energy Storage Facility

Halewick Lane, Sompting - Battery-based Energy Storage Facility is a power plant under construction in Adur, England, United Kingdom, with 50 MW of capacity, operated by West Sussex County Council and Public Power Solutions.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationAdur (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLand at (former) Waste Managem, Halewick Lane, Sompting, Lancing, BN15 0NDDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusUnder constructionDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date2 Jan 2019 (reference SDNP/18/06402/FUL, planning authority Adur)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorWest Sussex County Council (Public Power Solutions (PPS) / West Sussex County Council)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorPublic Power Solutions (Public Power Solutions (PPS) / West Sussex County Council)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity50 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates50.8469, -0.3285DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Construction started
  2. Permit applied for (planning authority Adur, reference SDNP/18/06402/FUL)

How it compares

Halewick Lane, Sompting - Battery-based Energy Storage Facility is the 478th-largest of 2,174 power plants planned, permitted or under construction in England and the 847th-largest of 3,222 in the United Kingdom by capacity; its 50 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England478th of 2,174185,888 MW<0.1%
United Kingdom847th of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data1,927th of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 45 grid connections (30 operating, 164 MW), 33 substations and 11 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
IBM HorshamData center——19 km
Binsted Farm PV grid connectionGrid connection3.98 MWOperating20 km
Binstead Farm grid connectionGrid connection12.2 MWPlanned20 km
Bilsham PrimarySubstation——21 km
Solar 10 MW grid connection at BilshamGrid connection10 MWOperating21 km
Billingshurst PrimarySubstation——22 km
Five Oaks PrimarySubstation——24 km
Digital Realty LGW15Data center——33 km