Power plant · Havant, England, United Kingdom

Bedhampton Pumping Station, Meyrick Road - Battery Energy Storage

Bedhampton Pumping Station, Meyrick Road - Battery Energy Storage is a planned battery storage plant in Havant, England, United Kingdom, with 150 MW of capacity, operated by E101 Hub 4 Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationHavant (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressBedhampton Pumping Station, Meyrick Road, PO9 1AYDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date1 May 2025 (reference APP/25/00351, planning authority Havant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorE101 Hub 4 Limited (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity150 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates50.8533, -0.9755DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit applied for (planning authority Havant, reference APP/25/00351)

How it compares

Bedhampton Pumping Station, Meyrick Road - Battery Energy Storage is the 211th-largest of 1,650 power plants planned, permitted or under construction in England and the 334th-largest of 2,548 in the United Kingdom by capacity; its 150 MW is <0.1% of the 279,068 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England211th of 1,650171,264 MW<0.1%
United Kingdom334th of 2,548279,068 MW<0.1%
All power plants planned, permitted or under construction in our data998th of 5,799657,076 MW<0.1%

Nearby

Within 50 km of this power plant: 185 grid connections (108 operating, 961 MW), 156 substations, 12 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Meyrick Road PrimarySubstation——1.4 km
Leigh Park PrimarySubstation——1.4 km
Waste 3.335 MW grid connection at Leigh ParkGrid connection3.34 MWOperating1.4 km
SSE data center, HavantData center——1.5 km
Brockhampton PrimarySubstation——1.5 km
Sewage gas 3.135 MW grid connection at BrockhamptonGrid connection3.14 MWOperating1.5 km
Bedhampton BESS grid connectionGrid connection57 MWPlanned1.7 km
Aquind InterconnectorTransmission line—Planned8.4 km
ServerHouseData center——13 km