Power plant · Redcar and Cleveland, England, United Kingdom

Tesside GigaPark - Battery Energy Storage System

Tesside GigaPark - Battery Energy Storage System is a planned power plant in Redcar and Cleveland, England, United Kingdom, with 1,000 MW of capacity, operated by NatPower UK.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationRedcar and Cleveland (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressWilton International, Castleton Court, Redcar, TS10 4RGDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date18 May 2026 (reference R/2026/0364/CL, planning authority Redcar and Cleveland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorNatPower UK (NatPower UK (NP SPV 27 Limited))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity1,000 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates54.5852, -1.1112DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit applied for (planning authority Redcar and Cleveland, reference R/2026/0364/CL)

How it compares

Tesside GigaPark - Battery Energy Storage System is the 30th-largest of 2,174 power plants planned, permitted or under construction in England and the 50th-largest of 3,222 in the United Kingdom by capacity; its 1,000 MW is 0.33% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England30th of 2,174185,888 MW0.54%
United Kingdom50th of 3,222300,461 MW0.33%
All power plants planned, permitted or under construction in our data76th of 6,455664,040 MW0.15%

Nearby

Within 50 km of this power plant: 230 grid connections (117 operating, 1,223 MW), 115 substations and 4 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Battery storage 250 MW grid connection at Old Hill Farm DirectGrid connection250 MWPlanned2.1 km
Gas 12 MW grid connection at GrangetownGrid connection12 MWOperating2.1 km
Landfill gas 2.027 MW grid connection at GrangetownGrid connection2.03 MWOperating2.3 km
LackenbySubstation——2.4 km
GrangetownSubstation——2.5 km
RedcarSubstation——3.6 km
Data center, Redcar (OSM way 1055031579)Data center——5.2 km
Lumen Technologies data center, MiddlesbroughData center——8.0 km
Pulsant data center, EnglandData center——14 km

Operator and place

More from NatPower UK

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page