Power plant · Northumberland, England, United Kingdom

High Brockland Farm, Brock Lane - Battery Energy Storage System

High Brockland Farm, Brock Lane - Battery Energy Storage System is a permitted power plant in Northumberland, England, United Kingdom, with 70 MW of capacity, operated by Bluefield Renewable Developments Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationNorthumberland (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressS/O High Brockland Farm, Brock Lane, West Sleekburn, Bedlington, NE22 7BXDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date7 Jan 2026 (permit 25/01726/FUL, Town and Country Planning Act, issued by Northumberland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date15 May 2025 (ref. 25/01726/FUL, Northumberland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date7 Jan 2026 (granted, ref. 25/01726/FUL, Northumberland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorBluefield Renewable Developments LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity70 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBatteryDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates55.1571, -1.5492DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its operator? Ask us.

How it compares

High Brockland Farm, Brock Lane - Battery Energy Storage System is the 359th-largest of 2,174 power plants planned, permitted or under construction in England and the 626th-largest of 3,222 in the United Kingdom by capacity; its 70 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England359th of 2,174186,088 MW<0.1%
United Kingdom626th of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data1,580th of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 173 grid connections (87 operating, 1,123 MW) and 112 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
WansbeckSubstation——0.2 km
Battery storage 30 MW grid connection at West Sleekburn BESSGrid connection30 MWPlanned0.5 km
West Sleek Burn BESS grid connectionGrid connection70 MWPlanned1.0 km
Waste 1.31 MW grid connection at AshingtonGrid connection1.31 MWOperating2.1 km
AshingtonSubstation——2.1 km
Blyth 132kVSubstation——2.3 km

Operator and place

More from Bluefield Renewable Developments Limited

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page