Power plant · County Durham, England, United Kingdom

Bluestone Farm, Low Lands - Solar Farm

Bluestone Farm, Low Lands - Solar Farm is a permitted power plant in County Durham, England, United Kingdom, with 50 MW of capacity, operated by Bluefield Renewable Developments Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationCounty Durham (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressBluestone Farm Low Lands Cockfield, DL13 5AWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date28 May 2024 (permit DM/23/00486/FPA, Town and Country Planning Act, issued by County Durham)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date21 Feb 2023 (ref. DM/23/00486/FPA, County Durham)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date28 May 2024 (granted, ref. DM/23/00486/FPA, County Durham)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorBluefield Renewable Developments LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity50 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area64 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates54.6226, -1.7895DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its operator? Ask us.

How it compares

Bluestone Farm, Low Lands - Solar Farm is the 478th-largest of 2,174 power plants planned, permitted or under construction in England and the 847th-largest of 3,222 in the United Kingdom by capacity; its 50 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England478th of 2,174186,088 MW<0.1%
United Kingdom847th of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data1,927th of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 264 grid connections (130 operating, 1,278 MW) and 158 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Solar 42.75 MW grid connection at Bluestone Farm PVGrid connection42.8 MWPlanned0.1 km
Battery storage and Solar 62.5 MW grid connection at Bucks Head HybridGrid connection62.5 MWPlanned1.2 km
Generation 1.188 MW grid connection at SkernesideGrid connection1.19 MWOperating6.7 km
Fylands BridgeSubstation——7.3 km
TorontoSubstation——8.0 km
Toronto 66/20kVSubstation——8.0 km

Operator and place

Grid connections attached to this power plant

More from Bluefield Renewable Developments Limited

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page