Power plant · Huntingdonshire, England, United Kingdom

Rookery Farm, Kimbolton Road - Solar Farm

Rookery Farm, Kimbolton Road - Solar Farm is a permitted power plant in Huntingdonshire, England, United Kingdom, with 50 MW of capacity, operated by Bluefield Renewable Developments Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationHuntingdonshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressSolar Farm Rookery Farm, Kimbolton Road, Stow Longa, Huntingdon, PE28 0TRDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date25 Jul 2025 (permit 24/00883/FUL, Town and Country Planning Act, issued by Huntingdonshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date24 Jul 2024 (reference 24/00883/FUL, planning authority Huntingdonshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date25 Jul 2025 (granted, reference 24/00883/FUL, planning authority Huntingdonshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorBluefield Renewable Developments LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity50 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area94.2 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.3234, -0.3717DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Huntingdonshire, reference 24/00883/FUL)
  2. Permit applied for (planning authority Huntingdonshire, reference 24/00883/FUL)

How it compares

Rookery Farm, Kimbolton Road - Solar Farm is the 478th-largest of 2,174 power plants planned, permitted or under construction in England and the 847th-largest of 3,222 in the United Kingdom by capacity; its 50 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England478th of 2,174185,888 MW<0.1%
United Kingdom847th of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data1,927th of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 11 data centers, measured from the coordinates in the facts above. The table shows the nearest 3.

NameKindSizeStatusDistance
Data center, England (OSM way 87850427)Data center——27 km
The Horizon CentreData center——28 km
West Cambridge Data CentreData center——33 km

Operator and place

More from Bluefield Renewable Developments Limited

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page