Power plant · Northumberland, England, United Kingdom

Burnt House Farm, Nedderton Village - Battery Energy Storage System

Burnt House Farm, Nedderton Village - Battery Energy Storage System is a planned power plant in Northumberland, England, United Kingdom, with 50 MW of capacity, operated by Bluefield Renewable Developments Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationNorthumberland (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressAdj Burnt House Farm, Nedderton Village, Bedlington, NE22 6AZDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date1 Apr 2025 (reference 25/01144/FUL, planning authority Northumberland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorBluefield Renewable Developments LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity50 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (co-located with re)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates55.1422, -1.6296DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit applied for (planning authority Northumberland, reference 25/01144/FUL)

How it compares

Burnt House Farm, Nedderton Village - Battery Energy Storage System is the 422nd-largest of 2,174 power plants planned, permitted or under construction in England and the 755th-largest of 3,222 in the United Kingdom by capacity; its 50 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England422nd of 2,174185,888 MW<0.1%
United Kingdom755th of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data1,832nd of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 177 grid connections (88 operating, 1,125 MW), 116 substations and 1 data center, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.

NameKindSizeStatusDistance
Burnt House Farm grid connectionGrid connection42.2 MWPlanned0.1 km
Burnt House Farm grid connectionGrid connection40 MWPlanned0.1 km
ReservoirSubstation——2.6 km
Battery storage and Solar 59.8 MW grid connection at Broadway House PVGrid connection59.8 MWPlanned3.0 km
MorpethSubstation——3.6 km
West HartfordSubstation——4.5 km
Stellium Newcastle CampusData center——16 km

Operator and place

Grid connections attached to this power plant

More from Bluefield Renewable Developments Limited

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page