Grid connection · England, United Kingdom
Land off Old Ferry Road grid connection
Land off Old Ferry Road grid connection is a planned grid connection in England, United Kingdom, with 4.9 MW of capacity, held by Enviromena Project Management UK Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | England (connects at Grovehurst Local) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Status | Planned (accepted to connect) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Holder | Enviromena Project Management UK Limited | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Attached to | Grovehurst Local 11kV (via a primary substation) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Capacity | 4.9 MW | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Technology | Solar | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Grid operator | South Eastern Power Networks plc (UK Power Networks, South East England licence area) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Queue date | 26 Jun 2026 | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Voltage | 11 kV | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Coordinates | 51.3874, 0.7307 | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.
How it compares
Land off Old Ferry Road grid connection is the 2,385th-largest of 3,539 grid connections in England and the 3,296th-largest of 4,870 in the United Kingdom by capacity; its 4.9 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 2,385th of 3,539 | 341,715 MW | <0.1% |
| United Kingdom | 3,296th of 4,870 | 467,981 MW | <0.1% |
| All grid connections in our data | 6,995th of 8,618 | 1,355,288 MW | <0.1% |
Nearby
Within 50 km of this grid connection: 340 power plants (134 operating, 7,050 MW), 235 substations, 11 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Morrisons roof mounted solar | Power plant | 2 MW | Operating | 2.1 km |
| Ridham CHP Plant | Power plant | 25 MW | Operating | 2.3 km |
| Kemsley Fields Business Park - Hydrogen Renewable Energy Generation Plant | Power plant | 80 MW | Planned | 2.3 km |
| Grovehurst Local 11kV | Substation | — | — | 2.9 km |
| Queenborough 6.6kV | Substation | — | — | 3.2 km |
| Sittingbourne West 11kV | Substation | — | — | 5.2 km |
| Sota Datacentre | Data center | — | — | 8.2 km |
| CustodianDC Maidstone | Data center | — | — | 17 km |
| CXD Infrastructure Solutions | Data center | — | — | 18 km |
Holder, grid operator and place
More from Enviromena Project Management UK Limited
- Crookedstone Farm PV grid connection49.9 MW
- Lilley Bottom grid connection30 MW
- (ANM) Oxborough Road grid connection25 MW
- High Barnes Farm, Coal Lane - Solar Farm49.9 MW · permitted
- Elstronwick, Burstwick - Daisy Hill Solar Photovoltaic Farm35 MW · permitted
- High Barnes Farm, Coal Lane - Battery Storage25 MW · permitted
- Martin Farm, St. Marys Road - Solar Panels16 MW · permitted
- Fox Cover Solar Farm - Ground Mounted Photovoltaic Panels8 MW · permitted
Other grid connections in England
- Bute Hydrogen Project 1 grid connection4,800 MW
- Drax BECCS grid connection3,906 MW
- Drax Power Station grid connection3,906 MW
- Bute Hydrogen Project 2 grid connection3,600 MW
- Bute Hydrogen Project 3 grid connection3,600 MW
- Bute Hydrogen Project 5 grid connection3,600 MW
- Bute Hydrogen Project 6 grid connection3,600 MW
- Hinkley Point C grid connection3,340 MW
Data on this page
- California ISO. CAISO queue report, CAISO Privacy and Terms of Use.
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- NYISO interconnection queue. NYISO interconnection queue, Free reuse.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- PJM New Services Queue. PJM New Services Queue, Free reuse.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.
- UK Power Networks. UK Power Networks open data portal, CC BY 4.0.