Lilley Bottom grid connection

Lilley Bottom grid connection is a planned grid connection in England, United Kingdom, with 30 MW of capacity, held by Enviromena Project Management UK Limited.

Map: where Lilley Bottom grid connection lies
51.9135, -0.3550 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Luton North Grid 132/33kV)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusPlanned (accepted to connect)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderEnviromena Project Management UK LimitedUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Capacity30 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologySolarUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Queue date5 Sept 2025UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage33 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates51.9135, -0.3550UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

How it compares

Lilley Bottom grid connection is the 1,078th-largest of 3,539 grid connections in England and the 1,536th-largest of 4,870 in the United Kingdom by capacity; its 30 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England1,078th of 3,539341,715 MW<0.1%
United Kingdom1,536th of 4,870467,981 MW<0.1%
All grid connections in our data4,855th of 8,6181,355,288 MW<0.1%

Nearby

Within 50 km of this grid connection: 425 power plants (152 operating, 3,700 MW), 389 substations, 100 data centers (1 operating, 88 MW), 1 AI supercomputer and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Wandon End - Solar Farm & Battery StoragePower plant49.9 MWPermitted2.0 km
Stopsley 11kVSubstation——3.1 km
Luton Airport Primary 11kVSubstation——3.4 km
Ld At Lawrence End Park &, Dane StreetPower plant5 MWOperating4.4 km
Luton North Grid 11kVSubstation——4.9 km
Land North of Chiltern GreeenPower plant5 MWOperating5.7 km
Data center, Dunstable (OSM way 526426719)Data center——10 km
Starwood HouseData center——13 km
BT Computer CentreData center——16 km