Power plant · Mole Valley, England, United Kingdom
Barnett Wood Lane - Battery Storage
Barnett Wood Lane - Battery Storage is a permitted power plant in Mole Valley, England, United Kingdom, with 98 MW of capacity, operated by Bluestone Energy.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Mole Valley (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Northwest of Barnett Wood Lane, KT21 2BU | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (planning permission granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 24 Sept 2025 (permit 24/02168/FUL, Town and Country Planning Act, issued by Mole Valley) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 7 Nov 2024 (reference 24/02168/FUL, planning authority Mole Valley) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 24 Sept 2025 (granted, reference 24/02168/FUL, planning authority Mole Valley) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Bluestone Energy | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 98 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery (stand-alone storage) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 51.3095, -0.3179 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Permit granted (planning authority Mole Valley, reference 24/02168/FUL)
- Permit applied for (planning authority Mole Valley, reference 24/02168/FUL)
How it compares
Barnett Wood Lane - Battery Storage is the 328th-largest of 2,174 power plants planned, permitted or under construction in England and the 535th-largest of 3,222 in the United Kingdom by capacity; its 98 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 328th of 2,174 | 185,888 MW | <0.1% |
| United Kingdom | 535th of 3,222 | 300,461 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 1,449th of 6,455 | 664,040 MW | <0.1% |
Nearby
Within 50 km of this power plant: 161 substations, 150 data centers (1 operating, 88 MW), 82 grid connections (48 operating, 489 MW) and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Digital Realty LHR13 | Data center | — | — | 6.8 km |
| Redcentric Byfleet | Data center | — | — | 12 km |
| Unit 1 | Data center | — | — | 13 km |
| Ready - 200MW Battery grid connection | Grid connection | 200 MW | Planned | 14 km |
| Generation 1.7 MW grid connection at Sunbury Cross | Grid connection | 1.7 MW | Operating | 14 km |
| Waste 3.7 MW grid connection at Sunbury Cross | Grid connection | 3.7 MW | Operating | 14 km |
| Sunbury Cross Primary | Substation | — | — | 14 km |
| Hope And Anchor Primary | Substation | — | — | 15 km |
| Feltham Primary | Substation | — | — | 16 km |
Operator and place
More from Bluestone Energy
- Coventry National Grid Substation, Hawkesbury Hall - Battery Storage98 MW · planned
- Middleton Road - Linwood Battery Energy Storage System69 MW
- Pilton Village, Luffenham Lane - Staveley Solar Array49.9 MW · permitted
- Laigh Park Water Treatment Works - Battery Energy Storage System49.5 MW · planned
- Malcolmwood Farm, Loanend Road - Battery Energy Storage System49.5 MW · planned
- Dougliehill Water Treatment Works, Dougliehill Road - Battery Storage49 MW · permitted
- Locks Street, Coatdyke - Battery Energy Storage Systems45 MW · planned
- Middleton Farm Cottage, Middleton Road - Solar Photovoltaic Array40 MW · permitted
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.