Power plant · Rugby, England, United Kingdom
Coventry National Grid Substation, Hawkesbury Hall - Battery Storage
Coventry National Grid Substation, Hawkesbury Hall - Battery Storage is a planned power plant in Rugby, England, United Kingdom, with 98 MW of capacity, operated by Bluestone Energy.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Rugby (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | S/O Coventry National Grid Substation, Hawkesbury Hall, Parrotts Grove, Coventry, CV2 1NQ | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Planned (planning application submitted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 30 Jul 2025 (reference 41157, planning authority Coventry) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Bluestone Energy | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 98 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery (stand-alone storage) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 52.4557, -1.4579 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchHow it compares
Coventry National Grid Substation, Hawkesbury Hall - Battery Storage is the 328th-largest of 2,174 power plants planned, permitted or under construction in England and the 535th-largest of 3,222 in the United Kingdom by capacity; its 98 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 328th of 2,174 | 186,088 MW | <0.1% |
| United Kingdom | 535th of 3,222 | 300,661 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 1,449th of 6,455 | 664,240 MW | <0.1% |
Nearby
Within 50 km of this power plant: 7 data centers, measured from the coordinates in the facts above. The table shows the nearest 3.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Data center, England (OSM way 710050084) | Data center | — | — | 11 km |
| Santander data center, England | Data center | — | — | 22 km |
| Santander data center, England | Data center | — | — | 22 km |
Operator and place
More from Bluestone Energy
- Barnett Wood Lane - Battery Storage98 MW · permitted
- Middleton Road - Linwood Battery Energy Storage System69 MW
- Pilton Village, Luffenham Lane - Staveley Solar Array49.9 MW · permitted
- Laigh Park Water Treatment Works - Battery Energy Storage System49.5 MW · planned
- Malcolmwood Farm, Loanend Road - Battery Energy Storage System49.5 MW · planned
- Dougliehill Water Treatment Works, Dougliehill Road - Battery Storage49 MW · permitted
- Locks Street, Coatdyke - Battery Energy Storage Systems45 MW · planned
- Middleton Farm Cottage, Middleton Road - Solar Photovoltaic Array40 MW · permitted
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.